0
Building Wilda
0

Join Axel and Iuliana of Building Wilda as they document their high-authority shell-up completion of a Schionning Wilderness 1340x performance catamaran.

0
Finally Leaving Home – DIY Catamaran Build Ep431
0

It may have taken some time, building a boat is a massive undertaking but trusting it to carry you and your loved ones into the unknown is a whole new level. ...

0
Welcome to Living with the Tide
0

Welcome to Living with the Tide, whether your a new viewer or a long time subscriber we would love to have you with us on this exciting project. Meet Morna, ...

0
S2E53 Wave Rover’s Keels receive their Ballast
0

I travel to my good friend Brian Smyth's homestead in Eastern PEI to turn lead tire weights into ballast for the keels. This episode is dedicated to the ...

0
Fixing Our Boat After Our WORST FEAR: An Offshore UFO Collision [Ep. 88]
0

Get Surfshark VPN at https://surfshark.deals/ssr and enter promo code SSR for 83% off and 3 extra months for free! We complete the repairs in Itajai, Brazil, ...

0
Cutting Into Our SAILBOAT – Collision Damage REVEALED [Ep.87]
0

We start cutting into our sailboat after a discovering salt water coming in from a collision at sea. Find out the extent of the damage with us as we haul out ...

0
S2E52 Building Stopped on Wave Rover
0

No video has been shot on Wave Rover and production has come to a virtual stand still... why? Make a one time donation to Wave Rover of $100 USD and your ...

0
S2E51 Designing and Building the Bilge Keels Part 2 || Wave Rover 650
0

With the help of Dr Brian Smyth, professor of engineering at the University of Prince Edward Island, we design and fabricate the Bilge Keels for the Wave Rover ...

0
The ULTIMATE Guide to Rigging on a Multihull Yacht
0

This week we're diving into the world of rigging! Specifically we're talking about rigging on multihulls- so, catamarans and trimarans. We discuss with the ...

0
S2E50 Designing and Building the Bilge Keels Part 1 || Wave Rover 650
0

With the help of Dr Brian Smyth, professor of engineering at the University of Prince Edward Island, we design and fabricate the Bilge Keels for the Wave Rover ...

0
WAVE ROVER FOR SALE!!!! $8,500 USD !!!
0

Wave Rover, my modified Contessa 26 is up for sale! This is the vessel that I sailed across the Atlantic twice as a solo sailor, on an 11 month voyage ...

0
S2E49 Installing Pine Deck Beams || Wave Rover 650
0

I build and install pine deck beams in anticipation of decking over the aft end of the Wave Rover 650 Make a one time donation to Wave Rover of $100 USD and ...

0
S2E48 Building and Installing Ring Frames || Filleting || Fiberglassing || Wave Rover 650
0

I build and install "Ring Frames" in anticipation of decking over the aft end of the Wave Rover 650 Make a one time donation to Wave Rover of $100 USD and ...

0
S2E47 Sealing Plywood with S1 Epoxy || Installing Crash Bulkheads and Bunk Tops
0

The plywood is sealed and major components are installed permanently. Check out how I'm filling the rest of my day (building a humble Bungalow for Mrs Rover): ...

0
S2E46 Big Storage Solutions for a Small Boat || Bunk Tops and Storage
0

I design and build large lids and openings for the large storage space under the bunks, but these serve 2 purposes... Make a one time donation to Wave Rover ...

0
S2E45 Crash Bulkheads || Inspection Hatches || MK3 Wind Vane Contest Winners
0

The inspection hatches arrive and I proceed with building and fitting the crash bulkheads. Later in the video I announce the 3 winners of the MK3 Wind Vane ...

0
S2E44 The Bunk Tops are Fitted and the Longitudinal Bulkheads are Fiberglassed in Place
0

The Longitudinal Bulkheads receive their fillets and fiberglass. The bunk top is fitted. Make a one time donation to Wave Rover of $100 USD and your name ...

0
S2E44  Longitudinal Bulkheads || Cleats and Stringers || Skeg Supports
0

A lot happens in this episode. Cleats and stringers are installed. The last two longitudinal bulkheads go in. And I manage to put extra supports for the skeg ...

0
S2E43 Win a set of MK3 Self Steering Plans || Wave Rover Time Machine
0

In this Time Machine Episode (2 months ahead of the regular timeline), I reveal the latest, and last, revision of the Wave Rover 650 superstructure. I also ...

0
S2E42 A Lot Happens: Filleting, Fiber-glassing and Prepping the Crash Bulkheads || Wave Rover 650
0

A pair of Ring Frames are fitted and fiberglassed in place. Crash Bulkheads are prepped and Mrs Rover lends a hand! Make a one time donation to Wave Rover of ...

0
S2E41 Water Tight Bulkhead || Bulkhead #5 is fitted || Wave Rover 650
0

Bulkhead 5 is fitted. This will be the forward water tight bulkhead. I manage to finish off the white oak keel beams with perfect fillets. Make a one time ...

0
S2E40 IT WAS THE BEST OF TIMES AND THE WORST OF TIMES!
0

Deck Beams, Longitudinal Supports, Filleting and Fiber-glassing... It all happens here! Mrs. Rover's natural exuberance shines very brightly in this one! Make ...

0
S2E39 Wave Rover gets Longitudinal Bulkheads
0

Longitudinal bulkheads go in. These are the biggest bulkheads on Wave Rover. Make a one time donation to Wave Rover of $100 USD and your name will be affixed ...

0
Ruby Rose 2- The Small Details that make a Big Difference
0

Ruby Rose 2 is getting closer and closer to launch, and we are so excited! This week we look at the small but important details that are so important for us. ...

WeBoating
Logo
Shopping cart