Johan and Malin celebrate four years of building RAN III from scratch, reviewing interior joinery, composite deckhouse lamination, and stern extensions while planning upcoming keel fabrication.

Inside their workshop at Sun Hill Farm in Sweden, Johan Hammarlund and Malin Löf paused construction on their 52-foot custom performance yacht, documenting a four-year milestone for RAN Sailing aboard RAN III. Having started the scratch build from bare piles of timber, glass fabric rolls, and barrels of epoxy resin, the couple used the occasion to evaluate major structural accomplishments across the hull and cabin layout before committing to the heavy outfitting phase ahead.

Johan acknowledged that maintaining perspective across a multi-year yacht construction project presents an ongoing mental hurdle:

“On a big project like this over multiple years, it’s sometimes hard to get a feel for the progress. For us, it sometimes feels like there’s hardly any progress.”

Taking time to review workshop photography from the previous twelve months confirmed substantial headway across the accommodations, deck superstructure, and exterior composite skin.

Cabin Joinery and Systems in the Owner’s Quarters

The forward owner’s stateroom served as the initial proving ground where the bare composite hull first transformed into a recognizable vessel interior. Here, Johan established the foundational joinery aesthetic, selecting the timber species and testing decorative trimmings. Because executing intricate wood trimmings across the entire yacht demanded excessive labor hours, the crew decided to restrict that specific detail exclusively to this forward cabin while preserving the broader architectural theme throughout the vessel.

Mechanical integration beneath the forward berth required careful planning:

  • Housing the bow jet thruster beneath the berth platform with watertight inspection lids
  • Fabricating accessible storage drawers under the bunk that slide open without lifting heavy mattresses
  • Installing 19 mm Armaflex elastomeric foam sheets across the hull sides and overhead to provide acoustic dampening and thermal climate control for winter cold and tropical heat
  • Setting structural skeleton bulkheads without formal naval architectural blueprints, establishing templates for remaining cabins

Port Guest Cabin Joinery and the First Completed Sole

Aft on the port side, the guest cabin saw rapid development over the past year, with nearly all interior joinery components constructed in place. Drawing from lessons learned in the forward quarters, Johan refined the joinery execution by running vertical corner posts continuously up to the deckhead rather than cutting perimeter trimmings, eliminating tedious labor while maintaining a clean aesthetic.

The space achieved major functional milestones:

  • Closing off the overhead paneling and fitting electrical wire routing conduits
  • Installing the cabin portlight, pending final trim frames and hull skin linings
  • Laying and bonding the cabin sole, marking the first finished floor surface completed anywhere on the yacht

This port cabin now stands ready for final surface linings and trim finishing during the upcoming colder winter work period.

Vacuum Bagging and Clearance for the Composite Deckhouse

Constructing the yacht’s sweeping composite deckhouse represented one of the most demanding undertakings of the entire build. Johan identified this pilot house structure as the central operational hub of the vessel and a non-negotiable architectural priority:

“And this is a contender for the biggest achievement this year, I think, building the whole deck house, which is if I would put it, this is the heart of the boat and the most important design feature on the on the whole boat, I think.”

Fabricating the deckhouse required laminating massive composite sandwich panels with epoxy and fiberglass cloth, followed by high-stress vacuum bagging cycles that occupied substantial workshop floor space. While Malin continues structural fiberglass tabbing on the interior bulkheads, laser measurements confirmed critical workshop clearance: the completed deckhouse clears the barn’s overhead timber beam, ensuring the hull can be jacked up and rolled outside onto transport gear without structural obstruction.

Aft Cockpit Ergonomics and Stern Swim Platform Extension

Moving aft, the crew tied the cockpit layout directly into the transom, producing an expansive flat lounging area across the aft deck. In the working cockpit, Johan revised the ergonomics by fabricating coaming boxes with integrated steering pedestals, creating secure backrests for the helm positions.

The most dramatic structural change involved extending the hull and grafting on an integrated swim platform:

  • The stern extension was originally omitted from early construction plans solely because the unextended barn lacked sufficient length between interior walls
  • Extending the workshop building allowed Johan to laminate the hull extension onto the stern, undertaking challenging overhead fiberglass work against gravity
  • Adding running length behind the dual helm wheels provides vital footing security in heavy following seas at night, keeping watchstanders from falling overboard while simplifying water recovery procedures

Exterior Fairing Regimen and Four-Year Labor Totals

Topside work accelerated with the installation of the main companionway entrance framing and sliding companionway door. Johan and Malin laminated composite toe rails along both port and starboard sheerlines, initiating a relentless cycle of fairing, long-boarding, and block sanding across the deck surfaces, bulwarks, and deckhouse sides.

A four-year labor audit reveals the immense physical dedication invested into RAN III:

  • Accumulating between 9 and 11,000 man-hours dedicated purely to physical yacht construction
  • Total labor hours strictly exclude filming, video production, and administrative computer research
  • Johan commits slightly over full-time hours daily in the barn while managing video filming
  • Malin divides her time between boatyard composite lamination 1 to 2 days per week and full-time video editing

Looking back at the feedback received from fellow sailors and builders, Malin emphasized the importance of the community:

“And all the comments and all the feedback that we get from the videos is such a great motivation to keep going in a big project like this. It’s really helpful.”

Upcoming Steel Keel Fabrication and Outfitting Phase

As the build enters its fifth year, the physical challenge transitions into a capital-intensive outfitting stage. One remaining structural milestone is the keel assembly, which will be fabricated off-site in a heavy commercial steel workshop rather than at the farm. The design calls for over 1,500 kg of structural steel fabrication, ballasted by 5 tonnes of cast lead. Ordering the keel assembly early removes a massive financial variable from the budget, clarifying remaining funds for electronic, mechanical, and deck hardware acquisitions.

Outfitting shipments have already begun arriving at Sun Hill Farm, including composite deck hatches, twin helm steering gear, and primary autopilot units. With the onset of winter, Johan plans to finalize interior cabin framing before returning outside in spring to apply exterior fairing primers, marine paint systems, deck coverings, and deckhouse glazing.

Milestone itemProject data
Vessel*RAN III* (52-foot custom performance cruiser)
Total labor9 to 11,000 man-hours invested over 4 years
Insulation19 mm Armaflex elastomeric foam sheets
Steel structureOver 1,500 kg fabricated steel assembly
Lead ballast5 tonnes of cast lead

Frequently Asked Questions

How many hours have Johan and Malin invested in building RAN III over four years?

Johan and Malin estimate they have invested between 9 and 11,000 man-hours directly into physical boat construction over their first four years, excluding time spent on filming and video editing.

What insulation material is used across the hull and deckhouse of RAN III?

The crew installed 19 mm Armaflex elastomeric foam across the hull sides and ceiling panels to provide thermal climate control in winter and summer while dampening acoustic vibrations.

Why was the hull extension and swim platform omitted from the initial construction plans?

The hull extension was initially excluded due to restricted space in the barn workshop. After extending the barn building, Johan laminated the swim platform to enhance cockpit security and simplify crew recovery from the water.

What are the structural specifications for RAN III’s custom keel?

The keel structure is designed to be built in a specialized commercial steel facility using over 1,500 kg of fabricated structural steel loaded with 5 tonnes of lead ballast.

Book a trip where this was filmed — near Amsterdam

See all 166 experiences in Amsterdam →

Support RAN Sailing

At WeBoating.com, we profoundly acknowledge the unwavering dedication that RAN Sailing invests in crafting each and every video or voyage. Their passion for delivering exceptional ocean content shines through every frame, and it's a labor of love that deserves your attention.

We invite you to watch their captivating videos here and actively engage with their content, including their social media links above. Liking, commenting, and sharing their work goes a long way in fueling their creative fire.

We're also inviting you to explore the gear, sponsorships, and boat partnerships highlighted in the "Four Years Building Our Dream Sailboat: Looking Back & Looking Ahead - Ep. 511 Ran Sailing" video description, or directly on YouTube. By engaging with these offerings or purchasing services and items, you directly support RAN Sailing, their collaborators, and the brands they're associated with.

To ensure you never miss an offshore update, consider visiting their official YouTube Channel to subscribe, like, and join their community directly.

If you have any feedback, corrections, or additional information about RAN Sailing or their videos, please use the comment form below to share your thoughts with us.

Thank you for being a part of our community and supporting the creators we cherish. Your time and support truly matter!

Support our production and join the RAN Sailing crew ~ get in direct contact with us, livestreams and meetups: https://www.patreon.com/ransailing

Our dreamboat is four years in the making and we cannot believe that we have been doing this full time for so long! This week we're doing a look back as well as looking ahead.

We are a Swedish family who have sailed the world since 2016 while sharing the adventures here on YouTube. While we are still sailing, our main focus now a days is building RAN III, a 52 ft sailboat that we are building from scratch. We post a new episode every Friday so make sure to subscribe and hit the bell to be the first to know when there is a new episode!

MERCH: https://ransailingstore.com/
Sustainable shirts, tees, bags and more in 100% organic cotton, designed by us!

PRODUCTS & CAMERA GEAR: https://www.amazon.com/shop/ransailing
We have collected some of the products we use in our cruising life and video making in our Amazon shop. If you buy any of the items from our shop, we get a small "ka-ching" in our cruising kitty (no extra cost for you). Thank you so much and thank you to Amazon Influencer program.

CONNECT WITH US
- Website: http://ransailing.se
- Instagram: http://www.instagram.com/ransailing
- Facebook: http://www.facebook.com/ransailing

Music credits: http://www.epidemicsound.com

Love,
Malin, Johan & Vera

Four Years Building Our Dream Sailboat: Looking Back & Looking Ahead - Ep. 511 Ran Sailing Location

  • Sun Hill Farm Boatyard, Västra Götaland, Sweden (58.7,12.3)
  • METSTRADE, Amsterdam, Netherlands (52.3418,4.8888)
We will be happy to hear your thoughts

Leave a reply


Latest Episodes from RAN Sailing

Explore the most recent voyages. Subscribe to the channel to never miss an update!

Showing 1-6 of 535 results
Four Years Building Our Dream Sailboat: Looking Back & Looking Ahead – Ep. 511 Ran Sailing
RAN Sailing

Four Years Building Our Dream Sailboat: Looking Back & Looking Ahead – Ep. 511 Ran Sailing

Johan and Malin celebrate four years of building RAN III from scratch, reviewing interior joinery, composite deckhouse lamination, and stern extensions while planning upcoming keel fabrication.
Carbon Fiber Hatches Are Here! Building a 52ft Sailboat Ourselves – Ep. 510 Ran Sailing
RAN Sailing

Carbon Fiber Hatches Are Here! Building a 52ft Sailboat Ourselves – Ep. 510 Ran Sailing

Johan Hammarlund and Malin Löf winterize their stable workshop and install flush carbon deck hatches on their custom 52ft yacht RAN III in Sweden.
Our 52ft Sailboat’s Annual Weigh-In & 3D Scan – Ep. 509 Ran Sailing
RAN Sailing

Our 52ft Sailboat’s Annual Weigh-In & 3D Scan – Ep. 509 Ran Sailing

Johan Hammarlund conducts an annual weigh-in on the 52ft sailboat Ran III, calculating hull balance shifts and scanning the keel recess template at Sun Hill Farm.
Our Sailboat Is Getting a Real Door! – Ep. 508 Ran Sailing
RAN Sailing

Our Sailboat Is Getting a Real Door! – Ep. 508 Ran Sailing

Johan and Malin craft a custom companionway door and hatch sliders for their 52-foot sailboat RAN III, machining Delrin runners and laminating 19 mm Coosa composite board with PET foam infill at Sun Hill Farm in Sweden.
Making an Entrance! Our 52ft Sailboat Gets a Sliding Hatch – Ep. 507 Ran Sailing
RAN Sailing

Making an Entrance! Our 52ft Sailboat Gets a Sliding Hatch – Ep. 507 Ran Sailing

The RAN Sailing crew builds a custom sliding companionway hatch and protective garage for their 52-foot sailboat, vacuum bagging composite layers in cold weather.
There’s No Manual For This! Building Our Own 52ft Sailboat – Ep. 506 Ran Sailing
RAN Sailing

There’s No Manual For This! Building Our Own 52ft Sailboat – Ep. 506 Ran Sailing

Johan Hammarlund and Malin Löf tackle a complex companionway hatch build for their custom 52ft sailboat RAN III, fabricating carbon-reinforced cedar guide rails and engineering a multi-position weather seal.
Browse All Videos
WeBoating
Logo
Shopping cart