Bob and Steve finish fitting the black locust beam shelf into Arabella. This involves some pattern making and a whole slew of hooked scarfs to be cut. While ...
With some help from Bob Emser @TheArtofBoatBuilding we get the breasthooks bolted into place and launch into the black locust beam shelf. Black locust is ...
With the sheer clamp bolted into place the next piece of the deck puzzle is the breasthooks. The breashooks join the clamp with the stem and stern posts and ...
Welcome back! This episode Steve gets the sheer clamp bolted together and fastened to the steam bent frames of Arabella. The clamp is the first piece of deck ...
In this episode we varnish the white oak clamp and start working on cleaning up Victoria's hackmatack knees. The knees were likely harvested from the roots of ...
In this installment we make progress on the big planer set-up and we launch into building the sheer clamp. The sheer clamp is the first piece of the deck ...
In this episode we fasten all the recently bent frames and Arabella becomes 100% framed! After that big milestone we launch into the deck structure which is ...
Now that the molds are out we can bend in the remaining 14 frames and finish framing Arabella! Big thanks to everyone who is following and supporting our ...
We've all been waiting to see this one. Arabella's molds finally get removed and we can see from stem to stern with nothing in the way! Big thanks to ...
For all those wondering where Alix has been and when he is coming back here are some answers for you! Spoiler alert: He is alive and well and enjoying some ...
This round we tackle the remainder of the planking rabbet, make and hang some cedar and start prepping framing stock. It won't be long until the molds come ...
We get all steamed up and tweak some steam bent white oak frames so they lay more fair with the planking. Measurements are taken off the hull and the ...
In this episode we install some more oak planks, remove the stairs to the second floor so we can keep planking and run out of dry oak for planking stock. ...
This round we re-stock the lumber pile with some glorious white oak, ash and some hickory. Steve designs, builds and launches a quick and dirty pram for ...
In this installment we get some much appreciated assistance and really motor along with the oak planking. With three of us in the shop two could work on ...
After numerous challenges and setbacks we are finally picking up the pace and getting into a solid groove! The replacement planks all go onto the hull quickly ...
This round we look to the future and start doing a little rigging preparation by roughing out some deadeye blanks. We also keep chugging along with planking, ...
In this episode we hit the lowest point yet on the build and remove the cedar planks we worked so hard to install onto Arabella. The oak pile got sorted and ...
No boat building in this video! Since the Open House got canceled and a birthday party could not occur, Steve spent his 35th birthday doing a little exploring ...
This round we dive into some plank repair on the hull and fix the cedar that exploded on us. Talk briefly about a new plank fastener we are using in ...
In this installment we continue fitting and hanging some cedar, we discuss why we are planking from the keel to the sheer as well as what we expect the oak to ...
In this installment we have a riveting good time attaching a cedar plank to the hull. We then install a pair of black locust butt blocks in Arabella to ...
In this installment we continue the battle with the brittle cedar planking and finally manage to get one fastened to the hull. Aaron tries his hand at fitting ...
The best laid schemes o' mice an' men... Well, we had quite the plans for the planking party and though we did get some accomplished, in the end they did go ...