There is a lot of time consuming but rewarding work in boat building. Cutting carlin joints to instal short beams is a good task to show how much time some of ...
Alix continues work on Arabella with making and installing the lodging knees at midship. These, along with the rigidity of the housetop, will help keep the ...
We all need a break from big projects and this time it's Steve's turn! As Alix stays back to look after Arabella and the boathouse to continue work on fitting ...
As we continue working on Arabella, we look ahead at starting to figure out the power plant. We got a beautiful new engine from Nanni Diesel last year and now ...
Boatbuilding can be a slow and tedious (yet rewarding!) process. As with many things in life, patience is a useful skill. In this episode, we work on making ...
Part way through the build of Arabella, we were told about a boat we should look at in Mattapoisett, MA. Although we didn't need another boat to restore we ...
As we said, "Alix will be back in the fall", it is now fall and Alix is back! We talk a bit about the our summer and our plans for the project and then get ...
Rebuilding a historic sailing yacht - Finishing Casting & Floors / Plank Stock (EP83) Support; http://www.sampsonboat.co.uk/support Become a Patron; ...
The time has come! We've all been waiting for the moment that big beautiful blue Nanni Diesel engine gets dropped into Arabella. She's been sitting patiently ...
Installing a motor on a brand new build, when doing it yourself, isn’t cut and dry. It’s easy to take for granted the simplicity of repowering an old boat or ...
They say "Do something you love, and you'll never work another day of your life", but when a tool doesn't do what it should and the task list for the day has a ...
Steve gets back to work on the deck structure as well as fitting the sampson post. This post which lies at the bow of the vessel needs to be very strong and ...
With some help from Thad and Satchel we decide on exactly where the openings for the fore hatch, house, and cockpit should go. With no experience sailing, it ...
Rebuilding a historic sailing yacht - Pouring Bronze / Fastening Floors (EP81) Support; http://www.sampsonboat.co.uk/support Become a Patron; ...
Deck beam construction has begun! In this episode we make great strides towards a framed deck in Arabella. The black locust shelves get varnished and prepped ...
Bob and Steve finish fitting the black locust beam shelf into Arabella. This involves some pattern making and a whole slew of hooked scarfs to be cut. While ...
Rebuilding a historic sailing yacht - Cutting for Propeller / Boring for Prop-Tube (EP80) Support; http://www.sampsonboat.co.uk/support Become a Patron; ...
With some help from Bob Emser @TheArtofBoatBuilding we get the breasthooks bolted into place and launch into the black locust beam shelf. Black locust is ...
With the sheer clamp bolted into place the next piece of the deck puzzle is the breasthooks. The breashooks join the clamp with the stem and stern posts and ...
Rebuilding a historic sailing yacht - Custom rivet press machine! - Wooden Boat Fastenings (EP79) Support; http://www.sampsonboat.co.uk/support Become a ...
Welcome back! This episode Steve gets the sheer clamp bolted together and fastened to the steam bent frames of Arabella. The clamp is the first piece of deck ...
https://saltandtar.org/ https://www.patreon.com/saltandtar ----- pledge per episode https://www.paypal.me/saltandtar --------- one-time donation (zero fees) ...
In this episode we varnish the white oak clamp and start working on cleaning up Victoria's hackmatack knees. The knees were likely harvested from the roots of ...
Thanks for watching everyone! Many thanks and much love, Ruthie https://saltandtar.org/ https://www.patreon.com/saltandtar ----- pledge per episode ...