Under intense Texas heat, Teal Goben rolled protective primer across the cabin exterior of SV bāsik while Linh Goben provided ground support from the cockpit. With morning cloud cover lifting, temperatures climbed rapidly on the exposed decks. Maintaining a single painting style across the cabin superstructure was necessary for uniform film thickness, leaving Teal to manage the rolling alone. As Teal noted, “Feels like a hair dryer out here.” With bare composite exposed, sealing the sanded radius under primer was critical before humidity or rain could compromise the surface.
Documenting their refit work on Onboard Lifestyle, the crew balanced heat against shifting Gulf Coast humidity. The cabin radius had been stripped down to eliminate crazed layers where earlier coats had failed. Applying TotalProtect barrier coat established a clean baseline across the radius, allowing the crew to verify surface uniformity before moving forward.
With cabin primer curing, Teal addressed an engineering flaw near the cockpit coaming where standing water pooled. The deck surface dipped 5/8 of an inch, creating a localized basin that prevented water from draining. Rebuilding the corner composite to elevate the low spot by 5/8 of an inch would require extensive composite reconstruction several feet back. Teal opted instead for a direct mechanical remedy: boring a 1-inch drainage scupper through the adjacent coaming.
After plunging a hole saw through the coaming slightly below deck level, Teal cut through the outer fiberglass skin and Nida-Core polypropylene honeycomb into a reinforced solid fiberglass corner. To protect the core from moisture intrusion, he dished out the honeycomb cells around the cut and filled the void with structural thickened epoxy mixed by Linh. Once the starboard scupper insert was bedded, Teal crossed 25 ft over to replicate the installation on the port side, ensuring symmetrical drainage.
Once the epoxy set, Teal trimmed the protruding drain tubes flush with the hull. Accessing the topsides from the dinghy, he ground shallow structural bevels around both drain exits to receive exterior reinforcement. Linh cut glass cloth and mixed epoxy while Teal laminated circular patches over the transitions, tying the drain inserts into the outer hull skin. After curing overnight, Teal planed the cured composite flush using long hand sanding blocks before applying a tight skim coat of TotalFair.
Fairing the catamaran decks proceeded in sequential 4-foot swaths. Teal relied strictly on rigid hand sanding blocks rather than orbital sanders, which risk cutting localized hollows into broad composite surfaces. Leveling each fairing pass required 2 to 3 hours of continuous block sanding with long strokes. To expose minor pinholes and dips, Teal conducted late-night inspections across the deck using a flashlight at grazing angles, marking imperfections for secondary fairing compound.
Once smoothed and cleaned, each section was masked around deck hardware and coated with TotalProtect barrier coats. Reflecting on the steady progress, Teal remarked, “We just got to hold this pace. Even if it’s not exactly perfect, it’s pretty damn close.” While passing rain squalls paused work and required canopy adjustments, cooler air followed, dropping temperatures 5 degrees and lowering humidity enough to complete the barrier coat applications.
Between deck laminations, attention turned to the catamaran’s articulating cabin doors, which had spent 6 months in storage. Preparing the primed panels for topcoat, Teal applied TotalBoat Wet Edge topside paint. As Teal explained his application schedule, “I ended up putting three coats on each side. That put six coats on all edges.” He applied the paint with a 1/4-inch nap roller, leaving a fine stipple rather than tipping off with a brush, and allowed 24 hours of curing time between coats before scuffing with a 3M abrasive pad.
Once the finish cured indoors away from direct sun and dust, Teal cleaned the stainless hardware and re-hung both door assemblies. The doors flex against hull-mounted pads to conform to the curved cabin shape when open. Reinstalling all 68 screws into their original holes produced clean alignment. Reflecting on the assembly, Teal stated, “There is no way that this door wiggles after being off for 6 months, everything just lines right up like it was never taken off.”
| Refit task | Dimension | Material and process |
|---|---|---|
| coaming scuppers | 1-inch diameter | drilled through core to remove a 5/8-inch low spot |
| deck fairing | 4-foot swaths | hand block sanded for 2 to 3 hours before barrier coats |
| cabin door finish | 3 coats per side (6 coats on edges) | rolled with 1/4-inch nap roller; 24 hours between coats |
| door hardware | 68 screws | fastened into original mounting holes after 6 months off boat |
A low spot on the deck dipped 5/8 of an inch, creating standing water that pooled against the coaming. Raising that corner of the deck would require rebuilding structural composite several feet back, whereas boring a 1-inch drain through the Nida-Core coaming allowed water to egress immediately with significantly less structural disturbance.
Teal avoided the orbital sander because rotary machines can produce uneven divots and dips across broad composite surfaces. Using long, steady strokes with a rigid hand sanding block kept the composite decks flat and true across each 4-foot working swath.
The cabin doors received three coats of TotalBoat Wet Edge topside paint on each face, resulting in six coats around all edges. Teal applied the paint using a 1/4-inch nap roller without brush tipping to maintain a slight stipple, allowing 24 hours of curing time between coats before scuffing with a 3M abrasive pad.
The articulating doors bend against protective pads to match the curved contour of the catamaran hull when latched open. Reinstalled with all 68 original screws after six months off the boat, the hinges and strike catches aligned precisely without binding or wiggle.
At WeBoating.com, we profoundly acknowledge the unwavering dedication that Onboard Lifestyle invests in crafting each and every video or voyage. Their passion for delivering exceptional ocean content shines through every frame, and it's a labor of love that deserves your attention.
We invite you to watch their captivating videos here and actively engage with their content, including their social media links above. Liking, commenting, and sharing their work goes a long way in fueling their creative fire.
We're also inviting you to explore the gear, sponsorships, and boat partnerships highlighted in the "One project Closes, Another Opens! - Onboard Lifestyle ep.405" video description, or directly on YouTube. By engaging with these offerings or purchasing services and items, you directly support Onboard Lifestyle, their collaborators, and the brands they're associated with.
To ensure you never miss an offshore update, consider visiting their official YouTube Channel to subscribe, like, and join their community directly.
If you have any feedback, corrections, or additional information about Onboard Lifestyle or their videos, please use the comment form below to share your thoughts with us.
Thank you for being a part of our community and supporting the creators we cherish. Your time and support truly matter!
On this week's episode of Onboard Lifestyle, the crew uses our previous momentum to not only button up a previously unfinished project but to get a huge jump on our next massive task. We have been stripping down basik's decks throughout the year, and with our time in Texas coming to an end, we focus on completing this massive project before we leave. Come back next time to follow our progress... see you then!
JOIN OUR CREW!
If you are interested in helping us produce these videos then please feel free to check out our Patreon page. https://www.patreon.com/onboardlifestyle
TIP JAR:
Enjoy our videos? Want to give us a virtual high-five? Treat us to glass of rosé or whiskey on the rocks or another book for Emma? Or pitch in on a tank of fuel? Click over to see how you can support our productions (most of the ways won’t cost you a dime):
https://www.paypal.com/cgi-bin/webscr?cmd=_s-xclick&hosted_button_id=YDXEXUHWSF634&source=url
SHIP'S STORE:
Want to purchase our sv basik gear? Check our our Merch Store and show us some love by grabbing a shirt or two! Designed by our Swabby Emma:
https://theletteringmachine.com/OnboardLifestyle/shop/home
PRODUCTS & CAMERA GEAR:
https://www.amazon.com/shop/onboardlifestyle?isVisitor=true
We have collected some of the products we use during our refit and to make videos in our Amazon shop. If you buy any of the items from our shop or anything else on Amazon (using the link), we get a few pennies added to our cruising kitty. Thank you so much and thank you to Amazon Influencer program.
Don't forget to like us on Facebook!
https://www.facebook.com/Onboardlifestyle-SV-basik-435111790177690/
Check out our website! Still updating. 😜
https://www.onboardlifestyle.com/
Explore the most recent voyages. Subscribe to the channel to never miss an update!