Fifteen hours after laying down the initial scratch coat on the upper deck of SV bāsik, Teal Goben returned to inspect the cure and prepare for the next skim of fairing compound. The custom 435 Featherlight catamaran, documented by Onboard Lifestyle, requires extensive composite deck fairing, high-build primer applications, and ground tackle servicing ahead of an approaching departure date.
With deck surfaces spanning nearly 1,300 square feet, the labor-intensive project demanded a systematic approach across multiple specialized products, including TotalFair fairing compound and TotalProtect epoxy barrier coat. To prevent tape adhesive from baking into the fiberglass under direct sunlight, Teal stripped the perimeter tape between applications before proceeding with the next phase of surface preparation.
Managing the extensive deck surface of bāsik required dividing the layout into nine distinct zones. Zones 1 and 2 had already received two coats of TotalProtect barrier primer, while zones 3, 4, and 5 carried one coat. The work day centered on zone 6, where loose paint had been stripped down to solid substrate in preparation for fairing compound applications.
“Well, it’s been about 15 hours. This has cured nicely, and this is just my first scratch coat, but my goal today is to work up here on this upper deck, get this one prepped, and do my first skim coat of fairing compound.”
Teal Goben
Low-angle sunlight proved essential for identifying surface hollows and high points across the deck crown. By monitoring how shadows fell across the panels, Teal identified minor imperfections and applied localized touch-ups before committing to full second coats and block sanding.
While Teal focused on manual labor at the boat, Linh Goben managed provisioning and meal preparation. On solo work days, Linh pre-packs lunches and dinners that require minimal galley effort during refit marathons. A dinner favorite—a pre-assembled chicken enchilada dish featuring Hatch green chiles—reheats in the oven in 20 minutes, prompting an immediate request for a restock.
“This meal is a perfect passage making meal that I do. Uh or you can also make it ahead of time. Kind of like your own frozen TV dinner.”
Linh Goben
Linh and Emma teamed up in the kitchen to assemble another batch of enchiladas. Emma handled knife work by dicing onions, which were sautéed in a pat of butter before building a light roux with two tablespoons of flour. The sauce combined chicken stock with half a cup of half-and-half and 4 oz of cream cheese, followed by shredded rotisserie chicken from Costco, pepper jack cheese, diced green chiles, homemade taco seasoning, and low-carb tortillas.
Back on deck, Teal completed the initial sanding passes using orbital, block, and hand-sanding methods to feather out the micro-thin fairing layers. Working against the clock, he applied a coat of TotalProtect high-build primer, timing the rollout to ensure a 6 hours cure window before evening moisture and dew could settle over the uncured resin.
The following morning brought a 25 degrees temperature drop and brisk working conditions. Low morning sun exposed remaining low spots on the primed sections, which required secondary fairing rather than additional primer thickness. To tackle the broad forward area around the deck hatches, Teal set up an assembly-line workflow with Linh.
“I have done countless batches of this for the captain, but I feel like we’re gaining some ground finally.”
Linh Goben
Rigging an overhead shade tarp prevented direct solar heat from accelerating the chemical cure of the TotalFair compound. Linh mixed small batches down below and ferried them on deck, enabling Teal to spread the material continuously across the cabin top without leaving his station. For the second skim coat, Teal switched from a flexible blade to a rigid spreader held perpendicular to the deck surface to shear off excess material and achieve a true flat profile.
Beyond composite deck repairs, the refit schedule called for inspecting the ground tackle on SV bāsik. With the catamaran resting in approximately 8 ft of water, the crew deployed the complete anchor rode onto the seabed before shuttling the chain links to the dock for a link-by-link assessment.
“This is one of the most important things on our boat and it’s got us through some pretty big winds in the past”
Linh Goben
While the working end of the chain had endured regular exposure and remained structurally serviceable, the bitter end that sat continuously in the damp chain locker showed heavy rust scaling and link thinning. Having served reliably through 8 to 9 years of offshore anchoring, the chain had reached the end of its safe operational lifespan.
“This has treated us quite well for eight years, a good eight years of use.”
Linh Goben
Inspection of the rope-to-chain rode confirmed a sound splice featuring at least a full foot of backsplice. While the primary anchor remained in fine working order, the degraded chain required complete replacement before departure. While Linh and Emma made a quick run to a local fish market to purchase a dozen fresh oysters, Teal continued orbital sanding with dust collection on deck, preparing for the final block-sanding stages.
| Refit Metric | Observed Specification |
|---|---|
| Deck Surface Area | Nearly 1,300 square feet divided into 9 zones |
| Initial Scratch Coat Cure | 15 hours before secondary fairing skim |
| High-Build Primer Dew Window | 6 hours of cure time prior to evening moisture |
| Overnight Ambient Shift | 25 degrees drop in working temperature |
| Anchor Chain Service Life | 8 to 9 years of active cruising deployment |
| Sounding Depth at Chain Pull | 8 ft of water depth beneath the hulls |
Teal divided the nearly 1,300 square feet of deck into nine zones to methodically manage the multiple coats of fairing compound, TotalProtect barrier coat, and final finish.
Linh uses rotisserie chicken, pepper jack cheese, Carb Balance tortillas, sautéed onions in a butter roux with chicken stock and cream, green chiles, cream cheese, and homemade taco seasoning, making dinners that bake in 20 minutes.
While the working end of the eight-to-nine-year-old chain looked reasonable, the bitter end stored deep in the chain locker was heavily corroded and falling apart, prompting the crew to search for replacement chain.
Teal rigged a shade cloth over the work area to prevent the sun from heating the deck surface and causing the TotalFair fairing compound to cure too rapidly before it could be smoothed.
At WeBoating.com, we profoundly acknowledge the unwavering dedication that Onboard Lifestyle invests in crafting each and every video or voyage. Their passion for delivering exceptional ocean content shines through every frame, and it's a labor of love that deserves your attention.
We invite you to watch their captivating videos here and actively engage with their content, including their social media links above. Liking, commenting, and sharing their work goes a long way in fueling their creative fire.
We're also inviting you to explore the gear, sponsorships, and boat partnerships highlighted in the "Our Anchor Chain is Done! - Onboard Lifestyle ep.406" video description, or directly on YouTube. By engaging with these offerings or purchasing services and items, you directly support Onboard Lifestyle, their collaborators, and the brands they're associated with.
To ensure you never miss an offshore update, consider visiting their official YouTube Channel to subscribe, like, and join their community directly.
If you have any feedback, corrections, or additional information about Onboard Lifestyle or their videos, please use the comment form below to share your thoughts with us.
Thank you for being a part of our community and supporting the creators we cherish. Your time and support truly matter!
On this episode of Onboard Lifestyle, with our departure date just around the corner, the crew has to work double-time on basik. Linh and Emma prepare delicious meals for the Captain to keep his energy level up. Then Linh joins in on the assembly line fun before giving our ground tackle a proper inspection. Come back next time as the deck projects starts to all come together...see you then!
JOIN OUR CREW!
If you are interested in helping us produce these videos then please feel free to check out our Patreon page. https://www.patreon.com/onboardlifestyle
TIP JAR:
Enjoy our videos? Want to give us a virtual high-five? Treat us to glass of rosé or whiskey on the rocks or another book for Emma? Or pitch in on a tank of fuel? Click over to see how you can support our productions (most of the ways won’t cost you a dime):
https://www.paypal.com/cgi-bin/webscr?cmd=_s-xclick&hosted_button_id=YDXEXUHWSF634&source=url
SHIP'S STORE:
Want to purchase our sv basik gear? Check our our Merch Store and show us some love by grabbing a shirt or two! Designed by our Swabby Emma:
https://theletteringmachine.com/OnboardLifestyle/shop/home
PRODUCTS & CAMERA GEAR:
https://www.amazon.com/shop/onboardlifestyle?isVisitor=true
We have collected some of the products we use during our refit and to make videos in our Amazon shop. If you buy any of the items from our shop or anything else on Amazon (using the link), we get a few pennies added to our cruising kitty. Thank you so much and thank you to Amazon Influencer program.
Don't forget to like us on Facebook!
https://www.facebook.com/Onboardlifestyle-SV-basik-435111790177690/
Check out our website! Still updating. 😜
https://www.onboardlifestyle.com/
Explore the most recent voyages. Subscribe to the channel to never miss an update!