Inside the shed outside Melbourne where their Schionning Wilderness 1340 sailing catamaran Wilda is being built, Axel and Iuliana of Building Wilda tackled an unplanned galley renovation: shoehorning a benchtop dishwasher directly into the lower galley cabinetry. The original layout allocated that under-counter recess for an oven, meaning no freshwater plumbing, dedicated drainage, or high-voltage wiring had been brought to that section of the boat. With both builders weary of washing galleys by hand, they altered course to prioritize daily onboard comfort.
Because the vessel is designed to operate completely without onboard gas, the crew repurposed the pre-installed gas line into a dedicated freshwater supply line. The existing 12-V galley circuitry was insufficient for heating water inside an appliance, prompting Axel to plan dedicated 220 to 240-V wiring. As Iuliana explained regarding the decision to alter the galley arrangement: “We both hate doing dishes. Who doesn’t? So, we’re trying to make our lives easier, more comfortable.”
Integrating a domestic benchtop dishwasher into custom marine furniture required substantial demolition. Axel spent roughly half an hour cutting away the finished edges of the marine ply cabinet to create an opening wide enough for the appliance. However, because the cabinet borders extended slightly past the adjacent bulkhead, the machine could not slide in evenly without binding against the framing.
To eliminate the high spots and achieve a flush profile against the interior wall, Axel took down the excess timber in stages, remarking during the cut: “Take off another 5 mm here.” Even after shaving the structural edges and taking repeated measurements, the initial dry-fit attempts stalled. The clearance was tight enough that the dishwasher still wedged against the cabinet interior before reaching its resting depth.
To gain the necessary clearance, the builders disassembled the dishwasher’s outer metal protective cover, trimmed the cabinet edges further, and sanded back the material behind the recess until the chassis slipped smoothly into the enclosure.
With the opening cleared, the base of the cabinet proved unsuitable as a direct mounting platform. The appliance required elevated placement to align with the surrounding joinery and provide clearance underneath for drainage and supply hoses. Axel and Iuliana designed an elevated shelf platform constructed from plywood spacers and an upper plywood mounting deck.
The builders debated whether to sheath the wooden shelf in fiberglass cloth before gluing it inside the locker. Axel decided against external laminating, preferring to glue the timber framework directly in place and seal it in position. The spacers and deck plate were leveled, bonded into the cabinet, and left to set.
To ensure total waterproofing against potential galley leaks, the crew treated every exposed timber cut: they applied an epoxy filler mix across the freshly exposed end-grain, sanded the compound flat the next day, and coated the timber with primer followed by a durable top coat. A dedicated hole was then drilled through the back of the shelf to route the water inlet and drainage plumbing.
Moving outside the cabin, the crew tackled the deck hardware required for line management. On Wilda, control lines lead aft under the bridge deck from the mast base into the cockpit, including two or three reef lines, a topping lift, and the main halyard. To shield these running lines from UV and foot traffic while maintaining a clean coachroof profile, Axel had constructed a custom fiberglass cover box.
Securing the molded fiberglass combing required a reliable fastening system that would remain demountable for future line replacements. Axel prepared mounting pads from solid hardwood, embedding two threaded inserts into each timber block so the cover could be bolted securely in place.
For final seaworthy installation before offshore passages, the crew planned to bed the entire perimeter in Sikaflex adhesive sealant. The polyurethane sealant serves as the primary structural bond to prevent water migration beneath the cover, while the mechanical fasteners provide redundant clamping security.
Back inside the interior, attention turned to the coated bamboo countertops in the galley and heads. The galley basin had already been positioned, but holes were still required for the freshwater mixer tap. In both the port aft bathroom and the second head, the crew needed penetrations for surface-mounted ceramic vessel basins and plumbing fixtures.
Rather than installing ultralight carbon basins, Axel and Iuliana selected ceramic sinks that mount on top of the counter, requiring relatively small circular cuts rather than large undermount cutouts. To protect the finished bamboo finish from tear-out or splintering while using hole saws, Axel taped masking tape over the marked centers before cutting.
A critical technical constraint governed every penetration: the lightweight interior sandwich core across the vessel contains cardboard honeycomb. Because paper honeycomb degrades rapidly if exposed to freshwater or greywater leaks, every drilled hole through the bamboo and its internal core must be excavated and sealed with epoxy barrier compound to safeguard the structural composite from moisture.
The final task revisited exterior safety hardware from an earlier build session. While interior grab rails and several roof handrails were already in place, the forward grab rails on the cabin roof presented alignment difficulties caused by the coachroof camber. Straight stainless steel mounting plates could not seat flush against the compound curvature of the composite roof.
Whenever one mounting point was tightened down, the opposing end flexed away from the pre-drilled holes in the deck. Axel summarized the geometric reality of working on custom catamaran curves: “The handle is straight and the boat is not. We knew that. It’s a little bit more work like everything else than than we would wish.”
To solve the mismatch, the builders manually bent the handrails and mounting bases to follow the roof profile, which required filling misplaced pilot holes with thickened epoxy and redrilling them once cured. Reflecting on the iterative fitting process, Iuliana noted: “Sometimes you have to do the drill, fill, drill exercise three times so that finally you get a good result, hopefully.” After vacuuming away drilling dust and letting the epoxy cure overnight, the crew bolted the rails securely to complete reliable handholds for future ocean passages.
The crew decided that eliminating daily manual dishwashing aboard SV Wilda was worth sacrificing the cabinet recess originally designated for an oven.
Because the catamaran is built without any onboard gas installations, the builders repurposed the pre-installed gas line into a dedicated water feed pipe.
Axel cut away the cabinet edges by an extra 5 mm, removed the outer metal protective cover of the dishwasher, and sanded back clearance in the rear.
The deck cover shields two or three reef lines, the main halyard, and potentially a topping lift running beneath the bridge deck from the mast base aft into the cockpit.
The countertops and internal bulkheads feature a cardboard honeycomb core structure that easily deteriorates if exposed to water leaks, requiring complete epoxy sealing.
Because the stainless steel rails were straight and the coachroof was curved, the crew bent the fittings and cycled through multiple epoxy drill-and-fill steps to align the mounting bolts.
At WeBoating.com, we profoundly acknowledge the unwavering dedication that Building Wilda invests in crafting each and every video or voyage. Their passion for delivering exceptional ocean content shines through every frame, and it's a labor of love that deserves your attention.
We invite you to watch their captivating videos here and actively engage with their content, including their social media links above. Liking, commenting, and sharing their work goes a long way in fueling their creative fire.
We're also inviting you to explore the gear, sponsorships, and boat partnerships highlighted in the "S04E06 - Dishwasher Installation and more Boat Jobs | Building Wilda" video description, or directly on YouTube. By engaging with these offerings or purchasing services and items, you directly support Building Wilda, their collaborators, and the brands they're associated with.
To ensure you never miss an offshore update, consider visiting their official YouTube Channel to subscribe, like, and join their community directly.
If you have any feedback, corrections, or additional information about Building Wilda or their videos, please use the comment form below to share your thoughts with us.
Thank you for being a part of our community and supporting the creators we cherish. Your time and support truly matter!
Wilda is a Schionning Wilderness 1340 sailing catamaran. She is being finished in a shed outside Melbourne. Wilda will be powered by the Sun, the Wind and the Sea...
This youtube channel is our way of sharing this project with friends, family and those interested in our adventure of building her and getting her into the water!
We are newbies to filming and video editing, but learning as we go.
We appreciate your kind and/or constructive comments, suggestions and feedback and we'd be happy to see that you like, subscribe and share our videos! Thank you!
For our youtube videos, we use royalty-free music from Artlist: https://artlist.io
Should you like to keep an eye on the progress of our build, please follow us on Instagram:
https://www.instagram.com/buildingwilda/
And on Facebook:
https://www.facebook.com/BuildingWilda/
Or visit our webpage:
https://www.buildingwilda.com
If you are here, you probably enjoy watching our videos and maybe you feel like you want to be part of our journey.
So, we created this page https://www.buymeacoffee.com/buildingwilda to help you support Building Wilda!
Explore the most recent voyages. Subscribe to the channel to never miss an update!