0
Acorn to Arabella – Journey of a Wooden Boat – Episode 52: Cutting the Aft Rabbet
0

As we steam in Arabella's frames we have now reached the aft section of the build and need to cut the rabbet up the sides of the stern posts to determine where ...

0
Acorn to Arabella – Journey of a Wooden Boat – Episode 51: A Day of Steaming Frames
0

Arabella has 70 frames. That's a fair amount of steaming. So, we thought it would be interesting to show what a full day of steaming looks like. Not to ...

0
Acorn to Arabella – Journey of a Wooden Boat – Episode 46: Steaming Frames
0

We had a lot to do in order to get ready for the steaming of the frames. We cut the frame sockets as well as milled up all the framing stock, and just in ...

0
Acorn to Arabella – Journey of a Wooden Boat – Episode 44: Putting Up the Molds
0

Need an explanation of bent frame construction? Here's the first part. We've been working fast now and after assembling the backbone, it was time to install ...

0
Greenland Kayak Build
0

Building a greenland kayak from the instructable. it took about 3 weeks. and cost around $100.

WeBoating
Logo
Shopping cart