0
Drilling & Epoxy Filling. From small to big holes – S03E34 | Building Wilda
0

In this episode we review the results and identify any additional filling work that might be necessary for installing the hatches and then we move on from the ...

0
Filling 1000 holes – S03E33 – Hinges & Hatches Install Prep work | Building Wilda
0

Last week we started the prep work for mounting hinges for various deck storage spaces and we also started drilling holes for the hatch installation. As ...

0
Fairing the salon and making a decision
0

Hello & welcome back to Building Wilda! In this episode we are moving on and continuing the fun with some sanding and fairing inside the salon. This video ...

0
Painting our Sailboat’s Waterline. Antifouling, Epoxy, Gelcoat & Hull Maintenance in the Boat Yard
0

All of our sailboat repair and maintenance blogs are now hosted on our dedicated maintenance channel, MOTHERSHIP MAINTENANCE Check it out here: ...

WeBoating
Logo
Shopping cart