More times spent for making things better.

I say more than two thierds of the time is spent on making the plans better. Among other things the main masts have been moved back 0.5 meters. This gives more space in the fore peak. It also gives more weather healm. Horses for courses. originally I had plan to sail eastwards to NZ. The new plan is doubbling Cape Horn east to west. Windward ability is now more important. I also plan to increase the skeg and rudder area. The planned route is now much shorter about 3 000 miles compared to the Madera - NZ route 14 000 miles. 100 days versus 180 days. This gives much more space in the boat therefore I now plan to bring fruits, mainly grapefruits and apples that keep a long time. The space for the fruit will be in the bedroom near the masts. When working with composite things take time to cure. The strategi is to have several areas where to work so that if epoxy cure in the saloon/sleeping room I can work in the dining room in the mean time. I am now starting on the saloon/sleeping room. To determine the heights of the sides I visited Exlex 2020. They were 24 cm high. I do not remember why I made them so low. Now they are increased by 10 cm plus the space below the mattras 20 cm where the 30 liter water and batteries lives. For more see Yrvind.com There you can also support my project by donations via Pay pal and Swish 0706 200 550

I say more than two thierds of the time is spent on making the plans better. Among other things the main masts have been moved back 0.5 meters. This gives more space in the fore peak. It also gives more weather healm. Horses for courses. originally I had plan to sail eastwards to NZ. The new plan is doubbling Cape Horn east to west. Windward ability is now more important. I also plan to increase the skeg and rudder area.
The planned route is now much shorter about 3 000 miles compared to the Madera – NZ route 14 000 miles. 100 days versus 180 days. This gives much more space in the boat therefore I now plan to bring fruits, mainly grapefruits and apples that keep a long time. The space for the fruit will be in the bedroom near the masts.
When working with composite things take time to cure. The strategi is to have several areas where to work so that if epoxy cure in the saloon/sleeping room I can work in the dining room in the mean time. I am now starting on the saloon/sleeping room. To determine the heights of the sides I visited Exlex 2020. They were 24 cm high. I do not remember why I made them so low. Now they are increased by 10 cm plus the space below the mattras 20 cm where the 30 liter water and batteries lives.
For more see Yrvind.com
There you can also support my project by donations via Pay pal and Swish 0706 200 550

Support Sven Yrvind

At WeBoating.com, we profoundly acknowledge the unwavering dedication that Sven Yrvind invests in crafting each and every video or voyage. Their passion for delivering exceptional ocean content shines through every frame, and it's a labor of love that deserves your attention.

We invite you to watch their captivating videos here and actively engage with their content, including their social media links above. Liking, commenting, and sharing their work goes a long way in fueling their creative fire.

We're also inviting you to explore the gear, sponsorships, and boat partnerships highlighted in the "More times spent for making things better." video description, or directly on YouTube. By engaging with these offerings or purchasing services and items, you directly support Sven Yrvind, their collaborators, and the brands they're associated with.

To ensure you never miss an offshore update, consider visiting their official YouTube Channel to subscribe, like, and join their community directly.

If you have any feedback, corrections, or additional information about Sven Yrvind or their videos, please use the comment form below to share your thoughts with us.

Thank you for being a part of our community and supporting the creators we cherish. Your time and support truly matter!

Latest Episodes from Sven Yrvind

Explore the most recent voyages. Subscribe to the channel to never miss an update!

Showing 1-6 of 1993 results
Mockup – No Ballast, Deckhouse Buoyancy for Self Righting
Sven Yrvind

Mockup – No Ballast, Deckhouse Buoyancy for Self Righting

This Youtube channel is about me Sven Yrvind. I am 87 and a half years old dyslectic solo sailor. I am building a plywood test boat for a Divinycell and NM-epoxy high-latitude cruiser. She will be about 4.5 meter or 14 feet and 9 inches long, the beam 1.36 meter, 4 feet 6 inches. She is a two mas...
The two bulkheads weakly installed.
Sven Yrvind

The two bulkheads weakly installed.

This Youtube channel is about me Sven Yrvind. I am 87 and a half years old dyslectic solo sailor. I am building a plywood test boat for a Divinycell and NM-epoxy high-latitude cruiser. She will be about 4.5 meter or 14 feet and 9 inches long, the beam 1.36 meter, 4 feet 6 inches. She is a two mas...
The Outer Coaming and Fiberglassing the Inner One.
Sven Yrvind

The Outer Coaming and Fiberglassing the Inner One.

Sven Yrvind fits the outer spray skirt coaming and laminates fiberglass onto the inner coaming in his workshop, refining his rope attachment setup and filleting the joint defenses.
Starting the Inner of Two Spray Skirt Coamings.
Sven Yrvind

Starting the Inner of Two Spray Skirt Coamings.

Sven Yrvind works in his workshop cutting and fitting inner and outer spray skirt coamings, detailing kerf measurements and fiberglass reinforcement.
Cutting the Divinycell Bulkheads.
Sven Yrvind

Cutting the Divinycell Bulkheads.

In his Västervik workshop, Sven Yrvind shapes composite bulkheads and constructs rounded hatch coamings with dual spray protection for his compact ocean cruiser, verifying hull symmetry and deck crown alignment.
Laminating the Two Bulkheads.
Sven Yrvind

Laminating the Two Bulkheads.

Sven Yrvind numbers and lays out fiberglass cloth before laminating two bulkheads with epoxy resin in his Västervik workshop for his 4.5-meter high-latitude cruiser test boat.
Browse All Videos
WeBoating
Logo
Shopping cart