Bending the Bottom a Bit.

In his Västervik workshop, solo sailor Sven Yrvind curves his floor angles with a 24 mm bend, squares the building jig using a 3-4-5 Egypt triangle, and stretches a centerline string to align upcoming hull molds.

Inside his workshop in Västervik, Sweden, Sven Yrvind secures metal angle profiles to the floor before curving them to establish a bottom profile. Inserting an extra piece beneath the center of the angles induces an upward camber across the foundation. Checking the center deflection verifies the shape: “Yes, it’s about 24 mm extra. So, well, that’s a good thing. And it’s even cool.”

Bending Floor Angles and Setting Bottom Rocker

With the angles fastened down, Sven shapes the rocker to produce greater depth toward the stem, stepping down 5 mm over a 25 mm span. Spacing between the frame positions along the floor shifts from 88 cm down to intervals of 60 cm, stretching the structure.

Fastening the curved metal requires downward pressure. Sven sets weights over the spans while driving bolt screws into place. Running low on nuts, he collects a set across the street from Granite to finish bolting the line.

Squaring the Jig with an Egypt 3-4-5 Triangle

To square the building bed, Sven turns to an Egypt 3-4-5 triangle. Across the jig, the transverse baseline measures 89 cm. Dividing this width by 3 yields a layout scale of 29.66 cm:

  • A perpendicular run of 118.7 cm along the baseline (four units of 29.66).
  • A diagonal hypotenuse of 148.3 cm (five units of 29.66).

Measuring 118.7 cm from the corner and extending across to 148.3 cm from both sides establishes a true right angle: “So, from this point across we just make a line. So, now it’s the right angle here.” Sven then transfers the layout across to align both sides parallel.

Running the Mold Centerline

To align the forthcoming hull molds, Sven bridges the structure with a piece of wood and fastens a taut string down the middle:

“So, all the molds going to know that they’re going to be on the same center line.”

This continuous string provides a single longitudinal axis for mounting all temporary station molds.

Layout dimensionMeasurementFunction in jig construction
Base transverse width89 cmBaseline divided by 3 setting 29.66 cm scale
Perpendicular leg run118.7 cmFour-unit run establishing right angle
Squaring hypotenuse148.3 cmFive-unit diagonal verifying square
Bottom rocker deflection24 mmIntentional curve offset at mid-span

Frequently Asked Questions

Why did Sven Yrvind bend the floor angles in his workshop?

Sven introduced a curve into the floor angles by adding an extra piece in the middle to create an intentional bottom rocker for the hull, measuring roughly 24 mm extra.

How did Sven Yrvind square the building jig?

He used an Egypt 3-4-5 triangle based on an 89 cm width divided by 3 (scale 29.66 cm), establishing a 118.7 cm perpendicular leg and a 148.3 cm hypotenuse.

How are the hull molds aligned down the length of the jig?

Sven mounted a piece of wood across the angles and stretched a string from the center all the way back to establish a shared centerline.

Support Sven Yrvind

At WeBoating.com, we profoundly acknowledge the unwavering dedication that Sven Yrvind invests in crafting each and every video or voyage. Their passion for delivering exceptional ocean content shines through every frame, and it's a labor of love that deserves your attention.

We invite you to watch their captivating videos here and actively engage with their content, including their social media links above. Liking, commenting, and sharing their work goes a long way in fueling their creative fire.

We're also inviting you to explore the gear, sponsorships, and boat partnerships highlighted in the "Bending the Bottom a Bit." video description, or directly on YouTube. By engaging with these offerings or purchasing services and items, you directly support Sven Yrvind, their collaborators, and the brands they're associated with.

To ensure you never miss an offshore update, consider visiting their official YouTube Channel to subscribe, like, and join their community directly.

If you have any feedback, corrections, or additional information about Sven Yrvind or their videos, please use the comment form below to share your thoughts with us.

Thank you for being a part of our community and supporting the creators we cherish. Your time and support truly matter!

This Youtube channel is about me Sven Yrvind. I am87 year and 5 months old dyslectic solo sailor.
I am building a Divinycell and NM-epoxy high-latitude cruiser.
She is 5.6 meter 18 feet 4 inches long. Her beam is 1.45 meter. She is a three masted lugger with a total sail area of 9 square meter. She has a bow daggerboard. I am planning a cruise in the Southern Ocean to Dunedin NZ.
Subject to change.
Often the 22th every month I do a resume of the project.
I have an illustrated book with good reviews on Amazon. https://www.amazon.se/s?k=yrvind&crid=1549D6PR18BUJ&sprefix=%2Caps%2C112&ref=nb_sb_ss_recent_1_0_recent
If you’re interested in contributing to my experiments links are below.
https://www.paypal.com/donate/?hosted_button_id=53X8NVEA22MBL
Swish 0706200550
Also please subscribe - even if you are not interested in sailing.
For more see Yrvind.com

Bending the Bottom a Bit. Location

  • Sven Yrvind Workshop, Västervik, Sweden (57.7578,16.6373)
We will be happy to hear your thoughts

Leave a reply


Latest Episodes from Sven Yrvind

Explore the most recent voyages. Subscribe to the channel to never miss an update!

Showing 1–6 of 2,006 videos
More small compartments on the development boat.
Sven Yrvind

More small compartments on the development boat.

Sven Yrvind works in his workshop to optimize the interior of his development boat, focusing on water bottle capacity and redesigning the dining and sleeping areas.
Another Wall for the Water Bottle Storage.
Sven Yrvind

Another Wall for the Water Bottle Storage.

Sven Yrvind works on the Oceanic XLX prototype, crafting a specialized storage area for water bottles and provisions using plywood and fumed silica epoxy.
A Divider Between the Charts and Water Bottles.
Sven Yrvind

A Divider Between the Charts and Water Bottles.

Sven Yrvind returns to his workshop in the snow to install a custom wooden divider on the Exlex, ensuring a clean separation between paper charts and water bottles.
Vertical Dividers.
Sven Yrvind

Vertical Dividers.

Sven Yrvind fits vertical subdivisions inside his 4.4-meter plywood test boat in Västervik, stiffening the hull structure and establishing interior storage layout for his high-latitude cruiser.
Monthly Update and Overview Nov 2026.
Sven Yrvind

Monthly Update and Overview Nov 2026.

In his workshop on New Year's Eve, Sven Yrvind shortens his plywood test boat to 4.4 meters, loads 18 water jugs for ballast, and details his route to Dunedin and rudderless steering fins.
Installing the middle piece.
Sven Yrvind

Installing the middle piece.

In his workshop, Sven Yrvind glues and shapes the middle section of his plywood test boat to divide the space beneath the bed, completing fiddles and preparing the hull sides.
Browse All Videos
WeBoating
Logo
Shopping cart