At Clarke’s Court Boatyard in southern Grenada, Connor prepped the starboard side of SV Big Lost for an essential propulsion overhaul before their scheduled splash day. Having sailed nearly 2000 nautical miles across 78 days from Florida down the Caribbean island chain to safe harbor for hurricane season, the crew aboard Sailing Big Lost hauled out to resolve yard warranty items and mechanical wear on their Vision 444 catamaran.
With yard work wrapping up and only one working day left on the hard, the immediate priority focused on the drivetrain. Working alongside Driftwood to address a failing hatch gasket and a cracked acrylic window covered under warranty by Vision Yachts, Connor still needed expert assistance to service the folding starboard propeller before the travel trailer arrived at the slips.
Before disassembling the underwater running gear, the crew drove out to BBC Beach to collect Michael Pale, who owns the sistership SV Mirror alongside his wife Sue. Michael and Sue had acquired their Vision catamaran just before Big Lost was constructed, turning them into experienced technical mentors for fellow owners traversing the islands. The 23 minute drive navigated Grenada’s narrow coastal roads, tackling steep grades and left-side traffic.
Michael had volunteered to inspect the hub assembly and guide the bearing replacement on the Gori propeller. With the haulout scheduled to conclude the following morning, having an experienced hand on the hard ensured the complex hub tolerances and safety hardware would be reassembled without delay.
Back under the hull at the boatyard, disassembly revealed flaking white material coating the metal surfaces. Michael identified the deposits as sacrificial zinc transfer that had migrated electrically and bonded across the housing. Before removing the hub, Connor shifted the drivetrain into gear to lock the shaft while Michael backed out the safety screws and retaining nut.
Holding the shaft against high breakaway resistance presents a major mechanical hurdle during haulout repairs. Rather than attempting to hold the engine flywheel with a wrench—a frustrating method that struggles against internal reduction ratios—Michael deployed a custom fabricated lever tool designed to bear against the hub without placing localized pressure on the hull. Using this jig, the team broke loose the nut, which had been torqued to 70 foot-pounds on the board.
“70 footbs. Yeah. So, it’s a lot of torque.”
Michael Pale
Sliding off the retaining rings and bearing bushings revealed the underlying condition of the drivetrain components. The outside ring exhibited minor wear, while the internal rubber interface remained smooth without shiny friction patches. Checking the splines confirmed a snug mechanical fit on the shaft with minimal play. However, comparing the old bearing bushing against a replacement part demonstrated noticeable slop. The original bushing showed a distinct worn ridge and substantial wiggle, whereas the fresh component seated firmly against the hub mating surface without walking.
Before reattaching the gear mechanism, Michael recommended coating the internal shaft splines with a dedicated marine lubricant to prevent underwater seizure and corrosion:
“There’s a really good uh it’s called TE45, TEF45. It’s like underwater. Uh it won’t like easily It’s great for this um splines.”
Michael Pale
With TEF 45 grease distributed evenly across the splines, Connor and Michael set about renewing the critical rubber stops inside the blade mechanism. These small elastomeric pads function as mechanical shock absorbers, dampening the sudden load and vibration that occurs when the folding blades fling open or shift into overdrive. Without healthy stops, repeated engagement creates excessive wear across the hub gears.
The crew smeared marine grease across the gear teeth, cycling the components back and forth to ensure smooth distribution. Connor applied thread-locking compound to the main shaft nut, threading it down until excess Loctite squeezed past the threads. After torquing the assembly tight, they secured two set screws to double-lock the fastener, installed the protective end cap, and aligned the internal index lines with the propeller housing.
| Operation / System | Metric or Specification |
|---|---|
| Offshore Voyage from Florida | Nearly 2000 nautical miles |
| Voyage Duration to Grenada | 78 days |
| Transit Time to BBC Beach | 23 minutes |
| Spline Lubrication Compound | TEF 45 marine grease |
| Propeller Retaining Nut Torque | 70 foot-pounds |
| Splash Time at Clarke’s Court | 8:30 in the morning |
| Catamaran Design | Vision 444 |
At 8:30 in the morning, the boatyard crew at Clarke’s Court backed the tractor trailer into position, sliding heavy steel I-beam supports beneath the catamaran’s bridgedeck. As the trailer rolled down the concrete slipway into the water, a sudden jolt startled the crew on the dock when the hulls shifted aft toward the support structure:
“The whole boat is shifted back like I thought it was going to hit the I beam the rudder scared the out of me.”
Connor
Fortunately, the rudders cleared the steel beams without impact as the hulls floated free. With the catamaran resting securely in the basin, Connor climbed aboard to prepare dock lines and hang fenders along both topsides. The yard crew tended the shore lines while Connor’s crew partner launched the tender from the ramp:
“Connor is going to get on board and um get the lines ready and the fenders up on both sides and then there’ll be guys here on the dock who can man the lines and I have to go get in the dinghy and bring it to the boat and I’ll meet him out in the water.”
Big Lost Crew
After rendezvousing in the open channel outside Clarke’s Court Bay, Big Lost motored eastward toward the marina docks at Le Phare Bleu, safely afloat with a serviced propulsion system ready for the next chapter of Caribbean cruising.
The crew hauled out to complete warranty repairs with Vision Yachts and Driftwood, including replacing a failing hatch gasket and fixing a cracked acrylic window, while also servicing their starboard Gori propeller.
Michael Pale, a fellow Vision catamaran owner who sails SV Mirror with his wife Sue, assisted Connor with inspecting tolerances, pulling the hub, and replacing the bushings.
Michael Pale used TEF 45, a specialized underwater grease designed to protect internal splines from corrosion and binding.
The rubber stops act as shock absorbers to cushion the impact when the folding blades swing open or shift into overdrive, preventing excessive gear wear and vibration.
After splashing at 8:30 in the morning at Clarke’s Court, SV Big Lost motored over to take a dock slip at Le Phare Bleu.
At WeBoating.com, we profoundly acknowledge the unwavering dedication that Sailing Big Lost invests in crafting each and every video or voyage. Their passion for delivering exceptional ocean content shines through every frame, and it's a labor of love that deserves your attention.
We invite you to watch their captivating videos here and actively engage with their content, including their social media links above. Liking, commenting, and sharing their work goes a long way in fueling their creative fire.
We're also inviting you to explore the gear, sponsorships, and boat partnerships highlighted in the "Boat Work in Grenada | Gori Prop Service & Splash Day!" video description, or directly on YouTube. By engaging with these offerings or purchasing services and items, you directly support Sailing Big Lost, their collaborators, and the brands they're associated with.
To ensure you never miss an offshore update, consider visiting their official YouTube Channel to subscribe, like, and join their community directly.
If you have any feedback, corrections, or additional information about Sailing Big Lost or their videos, please use the comment form below to share your thoughts with us.
Thank you for being a part of our community and supporting the creators we cherish. Your time and support truly matter!
After some much-needed time on the hard at Clarke’s Court Marina in Grenada, SV Big Lost is finally splashed back into the water! 🚤🌊
We tackled a few essential boat projects, including servicing our Gori Prop with the help of our good friend and fellow Vision owner, Michael. With the work complete, we’re excited to be floating again and ready for the next chapter of our Caribbean sailing adventure.
In this episode, you’ll see:
⚓ Clarke’s Court Marina splash day
🔧 Gori Prop maintenance & service
👨🔧 A fellow Vision owner lending a hand
🌴 Life back on the water in Grenada
It feels great to be back where we belong — on the sea, with new adventures on the horizon.
⚓️ Subscribe to follow our journey as we tackle the challenges of boat life, explore new destinations, and chase freedom one nautical mile at a time.
Follow along — from land to sea and back again — with Sailing Big Lost.
📸 Instagram: https://www.instagram.com/sailingbiglost/
🏝️ TikTok: https://www.tiktok.com/@sailingbiglost
🌎 Website: https://www.sailingbiglost.com
🎥 Patreon: https://www.patreon.com/c/Biglost
Thanks for Watching! We appreciate you! 💕
Don't forget to order your SBL swag at our store:
https://www.sailingbiglost.com/store
#SailingBigLost #SailingFamily #Vision444 #CatamaranLife #boatlife
🎵 Music licensed from Lickd. The biggest mainstream and stock music platform for content creators. Long Cool Woman (In a Black Dress) (1999 Remaster) by The Hollies, https://lickd.lnk.to/KnNmSVID!Sailing+Big+Lost License ID: XVJj387OdQn
🎵 Music licensed from Lickd. The biggest mainstream and stock music platform for content creators. My Sweet Lord (2014 Remaster) by George Harrison, https://lickd.lnk.to/7pKkzkID!Sailing+Big+Lost License ID: aMgaoD34VZB
Explore the most recent voyages. Subscribe to the channel to never miss an update!