Matt and Jessica Johnson of MJ Sailing have reached a decisive construction phase inside their workshop on Kent Island, Maryland, focusing on the master berth in the starboard hull of their custom catamaran build. With the helm pedestal position settled and the companionway steps locked into place, the project shifts toward routing the steering cables and engine controls down through the cabin before permanently enclosing the interior joinery.
For months, progress on the starboard hull remained on hold while the exact placement of the helm and cockpit access steps was determined. Once those foundational structures were secured, Matt began cutting away temporary fiberglass bulkheads to establish clean runs for the steering cables, shifter linkages, and electrical conduits.
The primary technical challenge centered on transitioning the steering lines from the cockpit pedestal down to the rudder blocks aft. Matt evaluated two distinct paths: running the lines externally along the cockpit seating back inside a custom enclosure, or directing them straight down through the interior of the master berth cabin. After reviewing the geometry, the crew chose the interior cabin run to ensure optimal mechanical efficiency and preserve deck ergonomics.
As Matt explained, “the best way to do it is just run it through our cabin because it’ll give us the most space”. Running the steering lines inside prevents any disturbance to the fairing work already completed on the cockpit exterior. More importantly, dropping the cables vertically into the cabin creates the straightest physical alignment, eliminating sharp bends and reducing friction on the steering cables.
To facilitate the cable run, Matt cut into the existing fiberglass wall that originally formed the back of the cockpit seat. On the other side of this bulkhead, adjacent to the newly constructed storage cabinet beside the steps, the steering lines descend toward a set of redirecting blocks. These blocks make a small angle adjustment before sending the cables directly aft toward the steering gear. Matt fabricated a curved fiberglass cover that mimics the existing interior hull contours, ensuring the enclosure blends smoothly into the cabin architecture without creating a cramped living space.
The enclosure also houses additional wiring runs and provides a protected location for the vessel hybrid motor controller. Because the motor controller generates heat during operation, Matt designed a watertight compartment equipped with dedicated ventilation. A louvered vent built directly into the compartment door pairs with an adjacent hull vent, establishing an airflow path where cool air enters and warm air exhausts to keep the propulsion electronics within safe operating temperatures while maintaining access for service.
With the structural storage lockers, line bins, and cable chase securely bonded, the master berth surfaces required extensive preparation before cosmetic finishing could begin. Although peel ply had been applied over previous laminations to create a uniform textured surface, the composite panels still required mechanical abrasion to key the substrate and blend factory-laid seams.
Matt systematically ground down residual cured resin drips and rough fiberglass seams left from the manufacturing process. Once mechanical sanding was complete, the entire work area received a thorough wipe down with clean acetone. Removing fine grinding dust and shop contaminants ensured maximum chemical and mechanical adhesion for the subsequent fairing compounds.
For the fairing phase, Matt selected two different materials based on structural location and surface area. At the helm station and around newly bonded structural components, he applied TotalFair epoxy fairing compound to maximize bond strength. Down inside the master berth, however, he transitioned to a polyester fairing compound. Spreading polyester compound across wide expanses of composite bulkhead allowed for rapid application and smooth leveling on the initial pass. After these broad surfaces receive an epoxy primer coat later in the build, any remaining pinholes or slight surface imperfections will be detailed with epoxy fairing compound.
After allowing the polyester fairing compound to cure overnight, Matt leveled the high ridges using a dual-action DA sander. To ensure no low spots were missed during leveling, he prepared a shop guide coat by blending blue dye into denatured alcohol. Wiping this blue mixture across the faired berth walls highlighted the surface topography: as the DA sander passed over the panels, the high areas sanded clean while the low areas retained the blue tint, providing an immediate visual map for secondary fill coats.
Between fairing passes below decks, Matt shifted focus to the exterior cabin top. The composite roof still retained a sacrificial fiberglass border that had been left in place by the manufacturing yard in Vietnam to protect the structural edges against impact damage during overseas transport.
Working in high ambient temperatures inside the shed, Matt donned a protective suit to shield against irritating glass dust. Using a cutting tool and an abrasive grinder, he rough-cut the sacrificial border back toward the finished cabin roofline. He then ground and sanded the cabin edge from the underside to create a clean, flush perimeter. This recessed perimeter prepares the cabin top for the installation of flush acrylic windows and establishes a smooth transition along the side deck where crew members look down toward the working sails.
Returning to the starboard hull, Matt tackled the fabrication of the inboard storage shelf bordering the master berth mattress platform. After dry-fitting the composite shelf pieces against the hull curvature, he prepared structural fillets to eliminate sharp interior angles. Using vinylester resin thickened with structural fillers, he radiused the joints where the shelf meets the berth base and filled the routed seam between the two shelf panels.
To laminate the shelf, Matt cut several patterns of 12 oz double bias fiberglass cloth using a pair of cordless WT-2 commercial electric shears. Praising the efficiency of the power tool over manual shears, Matt remarked that “wt-2 is incredible it cuts through anything”, noting that the motorized blades cleanly sliced through “six or seven layers without any problem at all” compared to standard scissors that bind on multiple plies.
Matt laminated multiple layers of the 12 oz double bias fabric over the thickened vinylester fillets, extending the structural tabbing up into the adjoining lazarette bulkhead and across the base of the bunk. Peel ply was smoothed over the wet laminate to consolidate the cloth and produce a textured surface ready for secondary bonding without requiring aggressive grinding.
Throughout the lamination, Jessica worked in the port hull touching up structural coves in preparation for final finish primer. Documenting the workflow required constant interruptions: the camera time-lapse function automatically shut down after 10 minutes of recording, forcing Jessica to regularly run between hulls to reset the recording equipment. With the inboard shelf laminated and cured, the master berth joinery stands fully integrated into the starboard hull, clearing the path for finish sanding and preliminary primer coats.
Routing the cables through the cabin created the straightest alignment to minimize mechanical friction, avoided altering previously faired exterior surfaces, and preserved valuable deck space.
Matt applied TotalFair epoxy fairing compound on structural components around the helm, and used polyester fairing compound across the large berth panels for easier spreading during the initial coat.
The dyed alcohol mixture served as a visual guide coat. After sanding, low spots remained colored blue to clearly indicate where additional fairing compound was required.
The factory in Vietnam left the sacrificial fiberglass flange intact to protect the edges of the composite cabin top from impact damage during shipping.
Matt used WT-2 electric scissors, which sliced cleanly through six or seven layers of 12 oz double bias fiberglass cloth without bogging down.
At WeBoating.com, we profoundly acknowledge the unwavering dedication that MJ Sailing invests in crafting each and every video or voyage. Their passion for delivering exceptional ocean content shines through every frame, and it's a labor of love that deserves your attention.
We invite you to watch their captivating videos here and actively engage with their content, including their social media links above. Liking, commenting, and sharing their work goes a long way in fueling their creative fire.
We're also inviting you to explore the gear, sponsorships, and boat partnerships highlighted in the "The Metamorphosis of our Master Berth (MJ Sailing - Ep 333)" video description, or directly on YouTube. By engaging with these offerings or purchasing services and items, you directly support MJ Sailing, their collaborators, and the brands they're associated with.
To ensure you never miss an offshore update, consider visiting their official YouTube Channel to subscribe, like, and join their community directly.
If you have any feedback, corrections, or additional information about MJ Sailing or their videos, please use the comment form below to share your thoughts with us.
Thank you for being a part of our community and supporting the creators we cherish. Your time and support truly matter!
Get 10% of your own photo printer through Liene!! (Compatible with all current offers) Use code Sail10dis
https://cutt.ly/3esQ4LKz
#lienemk #photoprinter #lienephotoprinter #InstantPrinter #Amberphotoprinter
This week Matt has started a new project of working to finish off our master berth in the starboard hull.
The big hold up this entire time was that we didn't know exactly where the helm would be positioned or how the steering cables would come down to the area under our cockpit seats - which is also the back of our berth. And wouldn't it have been a pain to finish it all off originally, only to have to sand down portions so we could glass in extra space for this?
Luckily it was worth the wait, because we did in fact have to add an extra box for the cables to be able to lead down at a specific angle. Matt adds that in, and then also cuts out a space (under the cockpit steps) where the fan for our electric prop will be.
After those are in place he goes through and fits out and glasses in the shelf which will sit at the edge of inboard side of the bed. (Now I just need to find the perfect cup holder to fit in there!!)
While I have been off of the port side of the boat, perfecting all the coves so all those surfaces can (fingers crossed) get their final coat of finish primer on, Matt also takes to working on the cabin top. The extra edge that came on it to protect it during shipping needs to be cut off, so Matt uses a grinder to get the bulk of it off, and then sands it down to a smooth finish.
Things are really coming along, and I think we might see the light at the end of the tunnel, that by this fall we won't be covered head to toe in dust everyday. :)
We hope you enjoy!!
Explore the most recent voyages. Subscribe to the channel to never miss an update!