11 Aug 2024 Done all etages for the side lockers

This Youtube channel is about me Sven Yrvind an 85 year and two months old dyslectic solo sailor building OCEANIC PHILOSOPHER a 5.7 meter long, 1.2 meter beam four masted lugger 6 square meter sail area, twin keeled, ocean going, high latitude cruiser. Often the 22 every month I do a resume of the project.
If you’re interested in contributing to my experiments links are below.
https://www.paypal.com/donate/?hosted_button_id=53X8NVEA22MBL
Swish 0706200550
Also subscribe
For more see Yrvind.com

Support Sven Yrvind

At WeBoating.com, we profoundly acknowledge the unwavering dedication that Sven Yrvind invests in crafting each and every video or voyage. Their passion for delivering exceptional ocean content shines through every frame, and it's a labor of love that deserves your attention.

We invite you to watch their captivating videos here and actively engage with their content, including their social media links above. Liking, commenting, and sharing their work goes a long way in fueling their creative fire.

We're also inviting you to explore the gear, sponsorships, and boat partnerships highlighted in the "11 Aug 2024 Done all etages for the side lockers" video description, or directly on YouTube. By engaging with these offerings or purchasing services and items, you directly support Sven Yrvind, their collaborators, and the brands they're associated with.

To ensure you never miss an offshore update, consider visiting their official YouTube Channel to subscribe, like, and join their community directly.

If you have any feedback, corrections, or additional information about Sven Yrvind or their videos, please use the comment form below to share your thoughts with us.

Thank you for being a part of our community and supporting the creators we cherish. Your time and support truly matter!

Ep 11 – Completing All Stages for Side Lockers Construction

This week on IR Wind, we join Sven Yrvind as he reaches a significant milestone in his boat-building process. After completing all the necessary stages, Yrvind has now successfully finished constructing the side lockers. Let’s delve into the detailed steps and techniques he used to achieve this feat.

Marking the Height

To ensure a good height, Yrvind begins by starting with one side locker and making small adjustments using wooden fillets. The lockers are then measured against a spirit level to achieve perfect leveling.

To get the height right, I start with this piece here, making it a bit smaller at the top to fit into these fillets, explains Yrvind. Then it goes down into this wedge and onto this ledge.

Cutting and Marking Pieces

Next, Yrvind marks all the pieces required for each locker before starting assembly. Each piece is marked with numbers for easy identification and order.

In this case, he says, This one here is number two because it’s got ‘two’ written on them. The numbered pieces are then arranged in their intended positions, allowing Yrvind to work on achieving the right height and leveling.

Leveling and Assembly

The side lockers are assembled using a Teflon-coated screw, which is screwed in with Yrvind’s driver. By creating an angle with the driver, he ensures that the locker maintains its desired height. The level is checked throughout the assembly process to ensure perfect alignment.

When it’s level, I can screw the other end on too, says Yrvind, demonstrating his technique for assembling these storage compartments while maintaining accuracy and stability.

The Use of Clamps and Spacers

To secure the lockers, clamps are used alongside spacers made from 9 mm plywood with an extra 3mm added to allow for bending. The use of a clamp spacer ensures that everything stays in place while the epoxy cures.

Preparation for Final Fit

In preparation for the final fit, Yrvind marks the plywood lid on both sides using black lines. He also makes small dots where screws will be placed to ensure he can locate them easily.

I make little dots with a black line where I can find them again, says Yrvind, showing viewers how he prepares his work area for the next step in the process.

The Epoxy Application

Finally, after all parts are properly aligned and marked, Yrvind applies epoxy to each side, ensuring a secure bond. He uses a brush with a ‘haircut’ to apply the second layer of epoxy, making the work process quicker.

In addition, he marks both sides of the pieces to aid in his work and shows viewers the black dots indicating screw locations against white epoxy.

Preparing for the Next Day

To end the day’s work, Yrvind prepares a list of tasks for the following day, involving gluing plywood pieces to create a ledge on the boat floor. He also explains how these will be attached along the bed lengthwise.

This meticulous construction process demonstrates the precision and dedication that Sven Yrvind puts into every aspect of building his boat. Through careful planning, marking, leveling, and assembly, he ensures that the side lockers are not only functional but also perfectly integrated with the rest of the vessel.

Latest Episodes from Sven Yrvind

Explore the most recent voyages. Subscribe to the channel to never miss an update!

Showing 1-6 of 1949 results
One Daggerboard, Two Bilgeboards and One Rudder.
Sven Yrvind

One Daggerboard, Two Bilgeboards and One Rudder.

This Youtube channel is about me Sven Yrvind. I am87 year and 5 months old dyslectic solo sailor. I am building a high-latitude cruiser. She is 5.6 meter 18 feet 4 inches long. Her beam is 1.45 meter. She is a three masted lugger with a total sail area of 9 square meter. She has a bow centerboard...
Starting the Interior – 1/5 Scale Model.
Sven Yrvind

Starting the Interior – 1/5 Scale Model.

This Youtube channel is about me Sven Yrvind. I am87 year and 5 months old dyslectic solo sailor. I am building a high-latitude cruiser. She is 5.6 meter 18 feet 4 inches long. Her beam is 1.45 meter. She is a three masted lugger with a total sail area of 9 square meter. She has a bow centerboard...
Why I Added 40 cm.
Sven Yrvind

Why I Added 40 cm.

This Youtube channel is about me Sven Yrvind. I am87 year and 5 months old dyslectic solo sailor. I am building a high-latitude cruiser. She is 5.6 meter 18 feet 4 inches long. Her beam is 1.45 meter. She is a three masted lugger with a total sail area of 9 square meter. She has a bow centerboard...
Shaping the 1/5 Scale Model.
Sven Yrvind

Shaping the 1/5 Scale Model.

This Youtube channel is about me Sven Yrvind. I am87 year and 5 months old dyslectic solo sailor. I am building a high-latitude cruiser. She is 5.6 meter 18 feet 4 inches long. Her beam is 1.45 meter. She is a three masted lugger with a total sail area of 9 square meter. She has a bow centerboard...
The Model Is Planked – It Was Easy.
Sven Yrvind

The Model Is Planked – It Was Easy.

This Youtube channel is about me Sven Yrvind. I am87 year and 5 months old dyslectic solo sailor. I am building a high-latitude cruiser. She is 5.2 meter 17 feet long. Her beam is 1.45 meter. She is a three masted lugger with a total sail area of 9 square meter. She has a bow centerboard. I am p...
Here Is the Next Iteration.
Sven Yrvind

Here Is the Next Iteration.

This Youtube channel is about me Sven Yrvind. I am87 year and 5 months old dyslectic solo sailor. I am building a high-latitude cruiser. She is 5.2 meter 17 feet long. Her beam is 1.45 meter. She is a three masted lugger with a total sail area of 9 square meter. She has a bow centerboard. I am p...
Browse All Videos
WeBoating
Logo
Shopping cart