With a narrow three-day window before slipping lines from Vuda Marina in Fiji, Max Campbell faced an intensive refit sprint aboard Elixir. After sailing out of New Zealand into a wet, rough week at sea, the classic yacht needed essential navigation and domestic upgrades before starting an upwind passage toward the southern Lau Group, documented on Untide.
The voyage plan aimed to circumnavigate the Fijian archipelago and spend months self-sustained in the South Pacific, but crucial maintenance had to be completed first while the vessel sat hauled out. As Max observed regarding the continuous maintenance demanded by a vintage hull, “Owning a boat is just like trying to stop it from destroying itself constantly.” Below deck, a new charcoal freshwater filter system was plumbed into place, knocking out the first domestic necessity on the work list.
Modernizing the masthead and electronics array formed the primary technical priority of the stopover. Max prepared to install a Quantum 2 radar dome from Raymarine on the front of the mast, carefully working around the existing baby stay, deck light, and halyards. Heading aloft into the rig, he drilled mounting holes directly through the mast section and secured the radar bracket in position using pop rivets.
The unit offered a distinct advantage for wiring through crowded spars, as Max explained: “This dome uses Wi-Fi to connect to the rest of the Rayarine system. So, we only need one cable, which is the power cable to go through the inside of the mast, which is great, which is going to save us a lot of hassle.” The upgrade marked a significant step in the long-term restoration of the yacht. Max reflected on how stripped-down his previous voyaging had been: “And I’d actually sailed all the way from the UK to New Zealand with minimal electronics, no chart plotter, radar or wind instruments, and not even a wind direction indicator at the top of the mast.” Joining as a brand ambassador enabled the gradual integration of modern instruments, bringing the classic boat into the 21st century after almost 60 years of service.
Back on deck, the electronics installation moved to the exterior helm and interior navigation station. Max ran two main lines from the exterior display position down into the cabin: a dedicated power lead and an RJ45 data cable. Due to the tight tolerances of the conduit runs, he cut the RJ45 cable to fish the wire through the narrow channel and reterminated the ends with fresh modular connectors to complete the data link.
Simultaneously, work progressed on the engine enclosure. Following a complete rebuild of the machinery space in New Zealand, the compartment required proper acoustic insulation. Max lined the bulkheads with fireproof insulating foam, systematically fitting panels with zero air gaps to isolate engine noise and heat from the living quarters. Outside in the tropical heat, final coats of varnish were applied under an awning before the vessel could return to the water.
With bottom and hull chores addressed, the boatyard hoist lifted Elixir out of the haulout pit and dropped her back into the harbor. Max checked the bilges immediately to ensure all through-hulls and fittings remained watertight before settling into a marina berth. Once the sun went down and temperatures dropped, the crew completed a thorough deck washdown to clear yard grime and dust.
A second trip aloft became necessary when questions arose regarding internal halyard clearance. Concerned that the new radar power wire might have wrapped around running rigging inside the mast, Max devised an inspection tool using a camera mounted on a long wire lead. Climbing the spar for the second day in a row, he lowered the camera down the spar to inspect the cable run and ensure the wiring remained completely isolated from the halyards. At the navigation desk, the new chart plotter powered on successfully, loading detailed cartography for Fiji and the Lau Group before transmitting its first radar signals.
On the final morning of the refit window, a severe mechanical failure threatened to delay departure. The engagement pin weld on the self-steering system had cracked during the passage north, requiring external welding in town. When Max attempted to reinstall the steering wheel onto the assembly, the main shaft sheared completely through. With departure imminent, he drilled into the broken shaft, tapped new internal threads, and fabricated an emergency mechanical fastener to lock the wheel securely in place.
The sudden breakdown reinforced the unpredictability of vintage boat maintenance: “Boats are just constantly trying to destroy themselves and you never really know what the next thing is going to be.” With the improvised steering repair holding firm and the diesel running, Elixir dropped lines from Vuda Marina to motor through the protected waters inside the barrier reef along Viti Levu. Heading east toward the Lau Group against prevailing trade winds, Max summarized the sprint: “Feels like literally million tasks over the last 3 days, but we’ve left the marina.”
| Component | Details |
|---|---|
| Preparation Window | 3 days at Vuda Marina |
| Marine Radar | Raymarine Quantum 2 Wi-Fi Dome |
| Mast Cabling | 1 internal power cable |
| Data Connection | RJ45 ethernet cable |
| Machinery Insulation | Fireproof acoustic foam with 0 air gaps |
Max Campbell and the crew had 3 days to complete all necessary repairs and installations at Vuda Marina before departing for the Lau Group.
Max installed a Raymarine Quantum 2 radar dome on the front of the mast, securing the bracket with pop rivets.
The Quantum 2 dome connects to the Raymarine display via Wi-Fi, which requires running only a single power cable through the interior of the mast.
The steering wheel shaft sheared completely off, forcing Max to drill into the shaft, tap new threads, and fabricate an emergency repair.
At WeBoating.com, we profoundly acknowledge the unwavering dedication that Untide invests in crafting each and every video or voyage. Their passion for delivering exceptional ocean content shines through every frame, and it's a labor of love that deserves your attention.
We invite you to watch their captivating videos here and actively engage with their content, including their social media links above. Liking, commenting, and sharing their work goes a long way in fueling their creative fire.
We're also inviting you to explore the gear, sponsorships, and boat partnerships highlighted in the "We Have 3 Days to Make Our 50-Year-Old Yacht Seaworthy" video description, or directly on YouTube. By engaging with these offerings or purchasing services and items, you directly support Untide, their collaborators, and the brands they're associated with.
To ensure you never miss an offshore update, consider visiting their official YouTube Channel to subscribe, like, and join their community directly.
If you have any feedback, corrections, or additional information about Untide or their videos, please use the comment form below to share your thoughts with us.
Thank you for being a part of our community and supporting the creators we cherish. Your time and support truly matter!
Elixir is (almost) finally ready to sail back into the South Pacific, and we have a very exciting few months of sailing ahead of us. We hope you enjoy!
I will find the perfect boat for you, for free! 👇
https://untidesailing.com/boat-match
Join the Untide Sailing Club here!
https://www.skool.com/untide-sailingclub/about
Explore the most recent voyages. Subscribe to the channel to never miss an update!