One Last Step Before We Launch! | Step 499

Dan and Kika fit new sails and finish running rigging on Uma in Sardinia, fabricating custom dodger line pass-throughs and mounting Lewmar clutches before an urgent yard launch.

In the boatyard in Sardegna, Dan and Kika received four boxes of running rigging and their new custom sails from Precision, beginning the final deck fitting stage before launch. After months of structural refit work on their 1972 Pearson 36, the crew aboard Sailing Uma unpacked the delivery to turn the bare hull back into a functioning offshore vessel.

Work began on the boom, where the stack pack had been mounted the previous afternoon. Dan and Kika hauled the mainsail onto deck, flaked the heavy cloth along the cabin top, and slotted each full batten and mast car into place. Working late into the still evening air, they hoisted the sail directly into the boom bag without wind or line snags.

“Uma is officially a sailboat again because we have at least one sail up and rigged.”

Dan

Custom Stainless Pass-Throughs for the Hard Dodger

Running all control lines aft into the cockpit presented a major engineering obstacle. Uma features a solid hard dodger, and conventional deck organizers would require large cutouts where ropes enter the sheltered seating area. On most cruising yachts, builders leave open holes that let breaking waves wash water directly across the cockpit companionway. Because Dan and Kika treat the dodger interior as an extension of the living cabin, Dan fabricated a custom stainless steel pass-through box with angled tubes to deflect incoming spray.

Using 3D-printed prototypes to establish the exact lead angles toward the cabin top clutches, Dan cut matching penetrations in the front face of the dodger. The metal fabrication houses angled guide tubes with internal baffle walls so incoming water drains harmlessly onto the open deck instead of penetrating inside. Dan bedded the stainless steel housing using Sikaflex, secured the fastening brackets beneath the deck, and led the spinnaker halyard through as the first line test. Hose testing confirmed the assembly kept 99 percent of water outside.

Lewmar Clutches, Cockpit Winches, and 800 Meters of Rope

The crew mounted primary winches, secondary winches, and clutches across the cabin trunk and cockpit coamings. In total, 21 Lewmar clutches control the halyards and trim lines across the vessel. Dan noted that the clutch levers pull directly toward the operator, delivering maximum mechanical leverage, while internal cascading domino friction rings let crew ease high loads gradually without first transferring line tension back onto a cockpit winch.

The running rigging package arrived custom-built from Premium Ropes in the Netherlands, a shop Dan and Kika originally visited in 2021. The manufacturers completed nearly all line splices to specification, leaving Dan only two specialized splices to complete on deck. With color-coded lines routed for the spinnaker halyard, code zero furler, boom preventer, and three distinct headsail sheets, the total length of cordage aboard Uma exceeded 800 meters including mooring lines.

Hardware & Rigging FeatureSpecification & Setup
Total Running Rigging CordageOver 800 meters across control and dock lines
Rope Clutches Installed21 Lewmar domino-grip friction clutches
Headsail Wardrobe3 headsails including Genoa, Solent jib, and storm jib
Dodger Spray Penetration BlockCustom stainless pass-through deflects 99 percent of water
Mast Halyard Tensioning Tracks2 Dyneema halyard lock tracks on Solent and Genoa

Mast Halyard Tracks and Solent Heavy-Weather Headsail

At the mast, Dan installed specialized jib halyard tensioning tracks for both the Solent stay and the Genoa. High-strength Dyneema halyards clip into sliding track blocks reinforced with protective Dyneema chafe sleeves. Once tensioned down under winch load, the split halyard is removed, eliminating dangling coils of excess halyard line swinging against the aluminum mast.

The updated foretriangle setup features three headsails: a primary Genoa, an inner Solent sail, and a dedicated storm sail. Dan also rigged the bowsprit, bobstay, and anti-torsion lines for the code zero and spinnaker furlers. The new Solent stay offers an efficient upwind and heavy-weather sail plan that Uma lacked during previous ocean passages.

Yard Stacking Deadlines and the Decision to Launch

With the main deck hardware bolted down, the boatyard management delivered an unexpected schedule constraint: winter storage boats were scheduled to be packed tightly across the yard staging lanes. If Uma was not placed in the travel lift slip within several days, the boat would remain boxed into the hardstand until spring.

Because the bilge pumps, electrical panels, anchor windlass, and rig were fully operational, Dan and Kika decided to launch immediately. Remaining interior carpentry in the galley, heads, and clothing lockers will be completed afloat in the harbor.

“technically Uma can sail, so might as well go in the water.”

Kika

Frequently Asked Questions

Why did Sailing Uma install custom pass-through boxes on the hard dodger?

Dan fabricated angled stainless steel boxes with internal baffles to lead mainsail control lines inside the hard dodger while preventing rain and sea spray from entering the living area.

How much running rigging cordage is installed on Uma?

Uma carries just over 800 meters of total rope, including dock lines, custom-spliced by Premium Ropes in the Netherlands.

How do the Lewmar rope clutches work on Uma?

The 21 Lewmar clutches pull toward the operator for mechanical leverage and use cascading domino friction rings to ease heavily loaded lines smoothly without requiring a winch first.

What is the purpose of the mast halyard tensioning tracks?

The tracks secure the Dyneema halyards for the Solent and Genoa at mast level under winch tension, eliminating dangling coils of halyard rope around the mast base.

Why did Dan and Kika decide to launch Uma before finishing the interior?

The boatyard began packing incoming boats for winter storage, threatening to trap Uma on the hardstand until spring unless launched immediately.

Which headsails are rigged on Uma for offshore sailing?

Uma is rigged with three headsails: a primary furling Genoa, an inner Solent heavy-weather jib, and a dedicated storm jib.

Book a trip where this was filmed — near Rome

See all 24 experiences in Rome →

Support Sailing Uma

At WeBoating.com, we profoundly acknowledge the unwavering dedication that Sailing Uma invests in crafting each and every video or voyage. Their passion for delivering exceptional ocean content shines through every frame, and it's a labor of love that deserves your attention.

We invite you to watch their captivating videos here and actively engage with their content, including their social media links above. Liking, commenting, and sharing their work goes a long way in fueling their creative fire.

We're also inviting you to explore the gear, sponsorships, and boat partnerships highlighted in the "One Last Step Before We Launch! | Step 499" video description, or directly on YouTube. By engaging with these offerings or purchasing services and items, you directly support Sailing Uma, their collaborators, and the brands they're associated with.

To ensure you never miss an offshore update, consider visiting their official YouTube Channel to subscribe, like, and join their community directly.

If you have any feedback, corrections, or additional information about Sailing Uma or their videos, please use the comment form below to share your thoughts with us.

Thank you for being a part of our community and supporting the creators we cherish. Your time and support truly matter!

▸ ▸ Spend less time searching and more time with the people who matter most. Head to https://zocdoc.com/sailinguma to find and book the care you need. 🤧 #sponsored

▸ Link to the PremiumRopes upcoming Work Shop:
SPLICING: https://www.premiumropes.com/online-workshop-splicing-modern-ropes-limited-offer
+ A special Friends and Family gift for you: Upon registration there is an extra set of practice ropes worth €20 for free.
Free LOOPS workhop : https://www.premiumropes.com/get-free-workshop-loops


▸ JOIN THE UMA NATION: The Uma Nation is what makes this YT channel possible. Join from $2/month to see our videos early and ad-free. https://www.patreon.com/sailinguma

Thanks to our top patrons for keeping this channel going 💙:
Special shout out to these legends:
Maje Brennan. John Seymour · Rod Collin · Robert H. Kraus · John Knox · greene02 · Douglas Fielder · Robert Sanders · lvanTheTerrible · Loree & George Reed · Eugene Duzant · Michal.

▸ BINGE WATCH our story from the beginning: https://youtu.be/lAye0mf2A8g
▸ SUBSCRIBE for weekly Videos: https://youtube.com/@SailingUma?sub_confirmation=1
▸ WEBSITE + MERCH: [http://www.sailinguma.com](http://www.sailinguma.com/)
▸ INSTAGRAM: https://www.instagram.com/sailinguma
▸ MUSIC PLAYLIST: https://open.spotify.com/user/lcddinzx0zfvcas46i441m4o0?si=de274c0424664ae0

One Last Step Before We Launch! | Step 499 Location

  • Sardegna Boatyard, Olbia, Sardinia, Italy (40.9237,9.5178)
We will be happy to hear your thoughts

Leave a reply


Latest Episodes from Sailing Uma

Explore the most recent voyages. Subscribe to the channel to never miss an update!

Showing 1-6 of 700 results
Finally Launching Our Sailboat After a 3 Year Rebuild | Step 500
Sailing Uma

Finally Launching Our Sailboat After a 3 Year Rebuild | Step 500

Dan and Kika prepare their 1972 Pearson 36 for splash day in Olbia, Sardinia, applying hull lettering, grinding the keel, and validating factory waterline trim after an extensive multi-year composite rebuild.
One Last Step Before We Launch! | Step 499
Sailing Uma

One Last Step Before We Launch! | Step 499

Dan and Kika fit new sails and finish running rigging on Uma in Sardinia, fabricating custom dodger line pass-throughs and mounting Lewmar clutches before an urgent yard launch.
Making Our Small Cockpit Twice as Useful | Step 497
Sailing Uma

Making Our Small Cockpit Twice as Useful | Step 497

Dan and Kika of Sailing Uma redesign their Pearson 36 cockpit, engineering a lightweight 6kg swiveling table after diagnostic weight testing exposed flaws in an overbuilt prototype.
We Ditched Our Steering Wheel (And Built Something Better)  | Step 496
Sailing Uma

We Ditched Our Steering Wheel (And Built Something Better) | Step 496

▸ Head to to get 10% off your first month with our paid partner, BetterHelp. Better is personal. Therapy should be too. ▸ JOIN THE UMA NATION: The Uma Nation is what makes this YT channel possible. Join from $2/month to see our videos early and ad-free. Thanks to our top patrons for keeping this...
We’re Finally Setting Sail Again!
Sailing Uma

We’re Finally Setting Sail Again!

▸ Guess what? We are Sailing around the world on our all-electric little sailboat, and we'd love to celebrate the start of this crazy adventure with you. Come hangout: Nov. 14-15, 2026 at Ocean Village Marina, Gibraltar. Let us know you are coming, RSVP link: ▸ JOIN THE UMA NATION: The Uma ...
4 Hours to Rig Solar for an 8-Month Solo Circumnavigation
Sailing Uma

4 Hours to Rig Solar for an 8-Month Solo Circumnavigation

▸ Follow Mara's journey here: ▸ JOIN THE UMA NATION: The Uma Nation is what makes this YT channel possible. Join from $2/month to see our videos early and ad-free. Thanks to our top patrons for keeping this channel going 💙: Special shout out to these legends: Maje Brennan. John Seymour · ...
Browse All Videos
WeBoating
Logo
Shopping cart