Kirk Williams and Lauren Williams are in the middle of framing their 36-by-64-foot post-frame boat barn in Northern Michigan. Designed to shelter their trailerable Farrier trimaran and support their ongoing homestead workshop, the structure has reached a pivotal phase as the crew prepares to lift and secure the roof trusses. Through their channel Sailing Soulianis, Kirk documents the practical realities of large-scale DIY carpentry, contrasting ground-level prefabrication against aerial assembly.
With the concrete footings poured and structural columns laid out, the build demands careful time management and equipment coordination. Maneuvering heavy timber overhead requires precision, especially when expensive machine rental rates and fluctuating weather conditions leave little room for procedural miscalculations.
In traditional post-frame construction, builders set individual vertical columns into the ground and subsequently nail horizontal wall girts in place one piece at a time from ladders or scaffolding. Kirk chose a modern prefabrication approach, assembling three-column wall sections flat on the ground before tilting them upward. Working on the ground allowed a single person to frame each section efficiently, with the initial bent taking 45 minutes and the final section requiring only 15 to 20 minutes.
After the framing materials had sat on site for three and a half weeks, the entire perimeter wall structure was raised and plumbed in just 4 hours with the aid of heavy machinery and 2 helpers. However, certain structural wall girts still had to be installed after the walls were stood upright. Working high on ladders in near 100% humidity proved taxing, especially after a long morning tending the garden and caring for a sick child. To make matters worse, Kirk’s homemade alignment jig broke twice and his cordless tool battery expired mid-climb.
“I could not imagine building this barn like this.”
Kirk Williams
Kirk spent half an hour wrestling to measure, cut, and secure just two boards while balanced aloft. That exhausting experience confirmed why pre-assembling wall panels on the ground is far superior for a small crew, saving dozens of hours of precarious ladder work.
When the manufactured roof trusses arrived, the delivery driver unloaded the entire package at the bottom of the driveway down by the road. An accommodating neighbor noticed the delivery and offered machinery to haul the trusses up the long driveway, dividing them into manageable stacks of two. This staging allowed Kirk to maneuver the timber by hand and install metal purlin hangers while working comfortably on the ground.
“The more we can do on the ground the better.”
Kirk Williams
Attaching hangers on the ground eliminated the dangerous necessity of having Kirk shimmy along the top chord of a wobbly 25-foot truss held aloft by only a single brace. Meanwhile, Kirk framed out the main garage door opening, calculating a diagonal span of 19 feet 8 and 5/8 inches. Having exhausted his supply of 20-foot two-by-fours, he assembled shorter lumber with diagonal bracing to complete the gable framing, playfully dubbing the patchwork layout modern art.
Amid the heavy carpentry, the family celebrated an enormous personal milestone. Two days prior to the planned truss lift, Lauren gave birth to their second child, baby boy Kai, who was introduced to big sister Renata and visiting family. With rain beginning to fall and wind picking up, Kirk donned a jacket to finalize truss spacing measurements before the telehandler arrived on site the following morning.
Setting the roof structure required rented heavy machinery, bringing a commercial telehandler on site at an expense of $1,000 per day. The ticking rental clock added immediate pressure to keep the machine moving without downtime. Kirk climbed 20 feet up to stand on top of a 2×4 wall plate, receiving the trusses as hundreds of pounds of timber swung through the air.
Kirk initially attempted to secure each truss by immediately locking roof purlins into their permanent hangers. He hoped this technique would eliminate the need to install and later strip away temporary braces. However, aligning tight purlins while balancing twenty feet above the dirt proved exceedingly difficult. Variations in timber pushed the trusses slightly out of plumb, threatening an accumulated error that would make the roof structure noticeably too long by the final bent.
Recognizing that theoretical efficiency was stalling progress, Kirk’s building partner offered a practical field correction. Rather than wrestling permanent purlins into tight metal pockets aloft, they treated the scrap lumber on site as temporary bracing material, nailing long boards diagonally across the interior truss webbing to secure the bents in approximate alignment.
This adjustment allowed the telehandler to continuously pick, swing, and place each truss without costly delays. Once all trusses were safely airborne and tied off, the crew could return from stable platforms to adjust spacing and secure permanent purlins at their own pace.
“There are some things that sound really good on paper that don’t end up being as nice in real life.”
Kirk Williams
The successful roof framing highlighted the essential balance between engineering prep and hands-on jobsite adaptation, transforming an open foundation into a sheltered boat barn ready for roofing.
| Metric | Details |
|---|---|
| Barn Dimensions | 36 feet wide by 64 feet long |
| Ground Bent Assembly Time | 15 to 45 minutes per 3-column bent |
| Wall Frame Erection Duration | 4 hours with heavy equipment and 2 helpers |
| Telehandler Rental Rate | $1,000 per day |
| Truss Elevation | 20 to 25 feet above ground |
The post-frame boat barn measures 36 feet wide by 64 feet long, built on their Northern Michigan property to house their trailerable boat and homestead equipment.
Installing metal purlin hangers while trusses were on the ground prevented Kirk from having to balance atop a wobbly 25-foot truss secured by only a single brace.
The telehandler rental cost $1,000 per day, creating substantial financial pressure to hoist and place all the trusses without operational delays.
Kirk’s building partner installed temporary dimensional lumber diagonally across the truss webbing, securing the trusses quickly so the telehandler could keep moving.
At WeBoating.com, we profoundly acknowledge the unwavering dedication that Sailing Soulianis invests in crafting each and every video or voyage. Their passion for delivering exceptional ocean content shines through every frame, and it's a labor of love that deserves your attention.
We invite you to watch their captivating videos here and actively engage with their content, including their social media links above. Liking, commenting, and sharing their work goes a long way in fueling their creative fire.
We're also inviting you to explore the gear, sponsorships, and boat partnerships highlighted in the "You Can't Learn to Build by Just Watching YouTube | Soulianis - Ep. 136" video description, or directly on YouTube. By engaging with these offerings or purchasing services and items, you directly support Sailing Soulianis, their collaborators, and the brands they're associated with.
To ensure you never miss an offshore update, consider visiting their official YouTube Channel to subscribe, like, and join their community directly.
If you have any feedback, corrections, or additional information about Sailing Soulianis or their videos, please use the comment form below to share your thoughts with us.
Thank you for being a part of our community and supporting the creators we cherish. Your time and support truly matter!
We're tackling one of the biggest steps in our post-frame barn build: getting the roof trusses up. Between a telehandler rental ticking away at a thousand dollars a day, figuring out how to install purlins 20+ feet in the air, and learning that some ideas work a whole lot better on paper than they do in real life, there's plenty to keep us humble.
We also get some unexpected help from a neighbor and welcome a new baby into the family right in the middle of all the construction chaos (because apparently we didn't have enough going on! 🫠).
We've done a ridiculous amount of planning and research, but as one of the most eloquent speakers of our day has stated, “Everyone has a plan until you get punched in the mouth.”
There's nothing quite like actually building the thing to show you how little you truly know. Have you tackled a big DIY building project? We’d love to hear what you learned along the way, especially if you've got post-frame construction experience… Tell us what we did wrong (or right) in the comments!
❤️
Lauren, Kirk, Renata & Kai
Chapters
00:00 The barn build so far
00:55 Three years later… are we still building?
02:08 The slow way to build
06:25 Getting the trusses ready
08:10 A new baby joins the chaos
09:33 The big day: raising the roof trusses
10:05 Learning as we go12:26 Purlins, problems, and lessons learned
Filmed: October 2023
⛵ FOLLOW THE JOURNEY
We started this channel in 2017 after buying our first sailboat. Now we’re building a life in Michigan while continuing to pursue our love of boats, sailing, and adventure. Thanks for coming along for the ride!
*SOCIALS + BLOG*
Patreon: https://www.patreon.com/sailingsoulianis
Instagram: https://www.instagram.com/sailingsoulianis/
Facebook: https://www.facebook.com/sailingsoulianis/
Website: https://sailingsoulianis.com
Kirk's Instagram: https://www.instagram.com/kirkhateswork/
*MUSIC*
Theme song: Adventures by A Himitsu https://soundcloud.com/a-himitsu
Creative Commons — Attribution 3.0 Unported— CC BY 3.0
Free Download / Stream: http://bit.ly/2Pj0MtT
Music released by Argofox https://youtu.be/8BXNwnxaVQE
Music promoted by Audio Library https://youtu.be/MkNeIUgNPQ8
All other music: ARTLIST — https://sailingsoulianis.com/artlistio-music — Use this link to get 2 FREE MONTHS of Artlist!
We’re always looking for music! If you, or a friend, relative or acquaintance makes original music and would like to feature it on our channel, give us a shout at [email protected].
*CAMERA GEAR*
https://sailingsoulianis.com/shop/camera-gear
*CREDITS*
https://www.freepik.com/free-vector/speedboat-crashing-rock-ocean_23818246.htm
#PostFrameConstruction #DIYBuilding #BarnBuild
Explore the most recent voyages. Subscribe to the channel to never miss an update!