Reset Password

Your search results
The First WOOD TRIM Goes On Our Homebuilt Catamaran (MJ Sailing - Ep 301)
September 9, 2023
The First WOOD TRIM Goes On Our Homebuilt Catamaran (MJ Sailing - Ep 301)

The First WOOD TRIM Goes On Our Homebuilt Catamaran (MJ Sailing - Ep 301)

The First WOOD TRIM Goes On Our Homebuilt Catamaran (MJ Sailing – Ep 301)

We take a very exciting step this week, and it is to begin a brand new part of finish work inside our catamaran. After getting our hands on some riff cut white oak this past spring, we’re now ready to begin trimming it down and installing the hardwood trim which will outline all of our cabinet doors.

Before the installation process can even begin, we need to measure and cut the pieces to size. But since they came to us with rough edges, we also need to mill them down to create smooth finishes. Matt’s last task, is to run them along our table saw (the router was giving us trouble) in order to create the t-shape which will fit into our de-cored edges.

When the pieces are ready to go in, we bond them with our TotalBoat wood epoxy, and use the level to get them plumb, as well as a dozen or so clamps to keep them in place. The next day Matt sands off any excess wood epoxy, and then it’s time to use our TotalBoat epoxy fairing compound to fill in low spots and gaps.

This takes just a few rounds, but we’re left with surfaces which are completely flush to the wall and straight lines from the trim, which we’ll be able to tape off when it’s time for the paint to go on.

In less than a week we were able to mill, bond and fair all the pieces in the owner’s hallway, so it feels like a huge move forward for us!

We hope you enjoy.

Link to our boat: https://maxcruisemarine.com/max42sc-s…

Thank you SO MUCH to our Patrons. These amazing supporters help keep us on the boat, our camera equipment up to date, and the videos coming. Without our patrons, these videos would not be possible.
To join the Patreon ranks, please visit http://www.patreon.com/mjsailing

or

Buy us a beer through PayPal! https://www.paypal.me/MJSailing

or

Help contribute to the build by shopping our Amazon Wish List!
For the build:
https://www.amazon.com/hz/wishlist/ls…

For the boat:
https://www.amazon.com/hz/wishlist/ls…

Delivery address:
Kentmorr Marina
910 Kentmorr Road
Stevensville, MD 21666
Thank you!, Matt & Jessica

Videos made by Jessica, featuring Matt and Georgie.

00:00 – We’re moving on to a NEW area of finishing!
01:30 – Cutting and milling our white oak hardwood
05:43 – Bonding trim to cabinet edges
09:05 – Making sure it’s plumb and flush
11:41 – I tried filling in the gaps
12:52 – Using Epoxy filler for the low spots
15:22 – Longboarding to blend it in
17:28 – Closing

— Get Our Merchandise: https://mj-sailing.myshopify.com/

The First WOOD TRIM Goes On Our Homebuilt Catamaran (MJ Sailing - Ep 301) Locations

  • Kent Island (38.9373391,-76.3289941)

Note of Recognition for MJ Sailing

At WeBoating.com, we profoundly acknowledge the unwavering dedication that MJ Sailing and other creators invests in crafting each and every video. Their passion for delivering exceptional content shines through every frame, and it's a labor of love that deserves your attention.

We invite you to watch their captivating videos and actively engage with their content, including their social media links above. Liking, commenting, and sharing their work goes a long way in fueling their creative fire.

We're also inviting you to explore any sponsorships and partnerships highlighted in the video description of "The First WOOD TRIM Goes On Our Homebuilt Catamaran (MJ Sailing - Ep 301)", or directly on YouTube. By considering their offerings or purchasing services and items, you not only support MJ Sailing but also the brands and collaborators they're associated with.

If you have any feedback, corrections, or additional information about MJ Sailing or their videos, please use the comment form below to share your thoughts with us.

Thank you for being a part of our community and supporting the creators we cherish. Your time and support truly matter!

Leave a Reply

MJ Sailing Lastest Videos

EXTENDING Our Custom Build Catamaran by THREE FEET!  (MJ Sailing – Ep 359)
EXTENDING Our Custom Build Catamaran by THREE FEET! (MJ Sailing – Ep 359)
Get 15% off your data plan for Saily by using code MJSAILING. Follow this link: https://saily.com/mjsailing We’ve waited years to attach the bows—and one wrong move could ruin it. Watch as we finally take the leap to bond them on. We're so happy the ...
CATAMARAN BUILD – Picking Interior Paint For Our Boat (MJ Sailing – Ep 357)
CATAMARAN BUILD – Picking Interior Paint For Our Boat (MJ Sailing – Ep 357)
Get your hands on THE BOOK: The Ultimate Guide to Rebuilding a Civilization Use code MJSAILING10 (10% discount, valid 1 month) https://mdsh.io/e2hrx7340f thebook #howtorebuildcivilization #hungryminds I'm so happy to tell you that we're 5/6ths of the way ...
Catamaran Build – SUIT UP TO STRIP DOWN!!  (MJ Sailing – Ep 357)
Catamaran Build – SUIT UP TO STRIP DOWN!! (MJ Sailing – Ep 357)
Use code MJSAILING at the link below to get an exclusive 60% off an annual Incogni plan: https://incogni.com/mjsailing We're at Stage 4 of painting, which means more work on the bridge deck! Because of the tight spaces and the hose of pressure/air that f...
We Have Our Hybrid Engine – HOW DO WE INSTALL IT?!?!(MJ Sailing – Ep 356)
We Have Our Hybrid Engine – HOW DO WE INSTALL IT?!?!(MJ Sailing – Ep 356)
Click the links below and use my code 25EFSMMJSA for an extra 5% off @EcoFlowTech WAVE 3 and GLACIER Classic. (The code is valid until May 25 and cannot be combined with other coupons). Get a free 110W solar panel with your WAVE 3 order(From April 25 to...
CATAMARAN BUILD: It’s Really Happening – Interior Paint Begins After 3 YEARS (MJ Sailing – Ep 355)
CATAMARAN BUILD: It’s Really Happening – Interior Paint Begins After 3 YEARS (MJ Sailing – Ep 355)
Click the links below for an exclusive discount on the @EcoFlowTech GLACIER Classic from April 18 to April 24! Pay $100 and get $300 off the GLACIER Classic. (The coupons can be redeemed between April 25 and May 25). EcoFlow GLACIER Classic: https://bit....
CATAMARAN BUILD: From Seams to Smooth – Cabin Top Progress Continues
CATAMARAN BUILD: From Seams to Smooth – Cabin Top Progress Continues
From three pieces into one, we're now continuing work on our cabin top. A coat of primer brings our cabin top seams closer to disappearing—plus adds vital UV protection to the fairing work beneath. In this week's video we turn to work on the exterior an...