
Gas/LPG/Propane BOAT INSTALL Ep.180 Building my steel sailing yacht
July 05, 2024 by Building SY Mistress | Language: EN Play Time: 00:16:31 | SAILING YOUTUBERS

Building SY Mistress has been a long and arduous process filled with countless challenges and victories. In this episode, we dive into one particular challenge that had us pulling our hair out – installing an LPG or propane gas fuel supply system for the stove oven.
Gas Install Drama
The gas install has been quite a journey, with many setbacks and disappointments. We first tried to tackle this task over two months ago, but we’re still not there yet.
Imagine how nice it would be if the information available to the public was accurate and complete so that we could do things right the first time. Alas, that’s not the case.
A New Plan and Solution
After multiple attempts and much frustration, we’ve finally found a new gas fitter who seems to know what they’re doing. They’ve provided us with the advice and materials needed to ensure that the install meets all Australian regulations.
Cutting Holes in Mistress’s Hull
We’ve marked a spot on Mistress’s hull for the through-hull fitting and drain for the gas locker. This location is nice and high up, but also lines up well with the bottom of the locker.
By angling the through-hull fitting, we can ensure that any liquids or gases are drained effectively. We’ve used proper sealing methods to protect the area and maintain integrity.
Installing Gas Sensors
In Australia, it’s not enough to simply install a gas supply; we also need to include gas alarm sensors. Two are required to meet standards.
We’ve installed one at the bottom of the stove oven space, as recommended. The other sensor will be mounted under the bottom of the pantry cabinet and then routed up along the bench and through a bulkhead to connect with the control panel.
Next Steps
With the gas install almost complete, we’re ready for the final inspection and sign-off. Mistress’s launch is imminent, so we’ll have our skilled gas fitter inspect everything and give us that much-needed certificate.
Conclusion
It’s been a long and challenging road, but we’ve finally overcome the hurdles of installing our LPG or propane gas fuel supply system. With the final inspection just around the corner, we’re excited to bring our galley to life.
Thanks for following along on this journey. Stay tuned for more updates and adventures as we build SY Mistress.
The Stove-Oven gas fuel (LPG/Propane) install for Mistress REALLY HAS BEEN a time consuming saga-aka sh#tshow- and one that tested my patience! I stayed sane by just moving on with other boatwork projects over the time taken to FINALLY get this sorted, well, mostly!
There are A LOT of necessary components in this, including the particular Aust. authorities approved "manufacturer only pre-lagged copper pipe"; the electrical install for both the automatic shut-off solenoid and Gas Detector alarm device along with the X2 sensors needing X2 different siting positions; the gas bottle locker drain involving holes being made to both the locker and hull; and I also get a brand NEW stove-oven (as has been the plan for some time) to replace the prior new, but too small, one that I had already installed previously.
Mistress is designed by one of the highly respected Dutch naval architects E.G. Van de Stadt, a Caribbean design, length 40ft/12m, beam 13ft/3.9m, draft 5ft/1.5m. Her hull and decks are built in mild steel and I have built her on my own and am also fitting her out on my own. I have not built any type of boat before Mistress.
There were many reasons why, but the work stopped,...
However, the work has re-started, thankfully, and I am on an exciting journey to finish Mistress and then go on my sailing adventures,...
I hope that you can join along with me!
@BuildingSYMistress
https://www.youtube.com/user/bmwfreedom
https://www.symistress.com
https://www.patreon.com/symistress
https://www.paypal.me/symistress
bmwfreedom@gmail.com
https://www.facebook.com/bruce.wilson.1481
Music thanks
www.bensound.com Creative Minds
Epidemic sound:
Waiting Down the Line-Wildflowers
Just Drive-Wellmess
A Very Nice Dream-Christophe Gorman
Gas/LPG/Propane BOAT INSTALL Ep.180 Building my steel sailing yacht Locations
- Sunshine Coast, Queensland, Australia (-26.6741,152.9922)
- Gold Coast, Queensland, Australia (-28.0148,153.3897)
Note of Recognition for Building SY Mistress
At WeBoating.com, we profoundly acknowledge the unwavering dedication that Building SY Mistress and other creators invests in crafting each and every video. Their passion for delivering exceptional content shines through every frame, and it's a labor of love that deserves your attention.
We invite you to watch their captivating videos and actively engage with their content, including their social media links above. Liking, commenting, and sharing their work goes a long way in fueling their creative fire.
We're also inviting you to explore any sponsorships and partnerships highlighted in the video description of "Gas/LPG/Propane BOAT INSTALL Ep.180 Building my steel sailing yacht", or directly on YouTube. By considering their offerings or purchasing services and items, you not only support Building SY Mistress but also the brands and collaborators they're associated with.
If you have any feedback, corrections, or additional information about Building SY Mistress or their videos, please use the comment form below to share your thoughts with us.
Thank you for being a part of our community and supporting the creators we cherish. Your time and support truly matter!
Building SY Mistress Lastest Videos

BRUTAL Below Waterline RE-Paint WORK! (pt.1) Ep.188 Building my steel sailing yacht
HEAPS of WORK going ON! I get the Deck Stripe painting done, my son Samuel joins me with his INCREDIBLY hard working and willing help with all sorts of things needing to be done as well as teaching me for my first ever Drone flight and we get stuck in to m...
The RE-PAINT WORK STARTS! Ep.187 Building my steel sailing yacht
Times are a' changing with Mistress! In this episode - my new/first DRONE finally gets up for some footage; YES, Mistress is in the water; I get back to full episode editing and with making a plan regarding episode footage release AND the RE-PAINT WORK STA...
Real time Update Oct.’24 – Building my steel sailing yacht
Since the beginning of September until the end of October, those 2 past months were seriously brutal on me, both physically and mentally, with A CRAZY, RIDICULOUS amount of work that HAD to be achieved, in order to first launch Mistress and then get her sa...
FIRST MEDIA INTERVIEW (+short update) Ep.186 Building my steel sailing yacht
Short Sept. Episode,... Well, the gusty winds as of yesterday and then the rains with the gusts started early this morning, foiling my painting plans and so I've put together a short 'explainer' video AND with a short interview that my local Channel 7 medi...
The LINING WORK resumes 😍 (pt.1) Ep.185 Building my steel sailing yacht
ABOUT TIME, RIGHT?! Although from afar you may at times have had puzzling thoughts about my, "methods in my madness" approaches and planning to the which, when and why with the fit-out boatwork, as explained several times, I KNEW that there were many other...