Reset Password

USD 0 to USD 10,000

Live aboard catamaran YouTube Videos

Showing 196-210 of 313 results
Deck Demoulding Final Prep – 12.7 mtr Catamaran Build Ep192
Life On The Hulls
Deck Demoulding Final Prep – 12.7 mtr Catamaran Build Ep192
Logistics are plenty at this point and squaring everything away before we put her lid on is the order of the day. Patreon Membership Thank you for supporting my production - https://www.patreon.com/lifeonthehulls If you would like to contribute to our p...
So much Boatwork going on  – 12.7Mtr Catamaran Build EP191
Life On The Hulls
So much Boatwork going on – 12.7Mtr Catamaran Build EP191
There is so much boatwork going on here this week as we prepare for the final demoulding of the deck and the spaces of the Catamaran become more confined. Big week on the Hulls for us this week. Patreon Membership Thank you for supporting my production -...
Triple Yacht Module Install – Complete Catamaran Build EP190
Life On The Hulls
Triple Yacht Module Install – Complete Catamaran Build EP190
Final install of 3 stateroom modules is the order of the day. I can't believe how quickly things are moving these days as I am able to tick the boxes and see the whole project coming to fruition. Patreon Membership Thank you for supporting my production ...
Not quite choosing the cushions and the drapes- Catamaran Build Ep189
Life On The Hulls
Not quite choosing the cushions and the drapes- Catamaran Build Ep189
Finishing the cabin modules is a pleasing stage of the Catamaran Build and the previously completed internal fitout of the wardrobes , has sped the whole process up. Knowing these are done I can move on to the final install and getting ready for the massiv...
Hacking into Furniture Modules – 12.7mtr Catamaran Build Ep188
Life On The Hulls
Hacking into Furniture Modules – 12.7mtr Catamaran Build Ep188
It's all coming down to the wire.Final fitout under the furniture cabin modules to create storage and underlying structure of the modules. Patreon Membership Thank you for supporting my production - https://www.patreon.com/lifeonthehulls If you would li...
I wish I had thought of that!  – 12.7mtr Catamaran Build Ep187
Life On The Hulls
I wish I had thought of that! – 12.7mtr Catamaran Build Ep187
Are you ready to make a change when required, if not , boat building may not be for you. This 12.7 mtr Catamaran Build is really taking shape. Now that I know a little bit more about the function of this Catamaran's system, I am forced to modify a major st...
Jammed in the forepeak – 12.7Mtr Catamaran Build Ep186
Life On The Hulls
Jammed in the forepeak – 12.7Mtr Catamaran Build Ep186
I find myself in some bizarre positions as I complete certain sections and this week I find myself Jammed in the forepeak completing the main structure of the crash bulkhead and the bow structure is now complete awaiting the position of the deck part that ...
That is just boat building – 12.7mtr Catamaran Build Ep185
Life On The Hulls
That is just boat building – 12.7mtr Catamaran Build Ep185
Even small jobs can take an absolute age. The thinking and finally the doing are two very intertwined things and when things don't go as planned in can really make or break your day - That is just boat building. Patreon Membership Thank you for supporting...
The Nitty Gritty – Catamaran Building Detail P184
Life On The Hulls
The Nitty Gritty – Catamaran Building Detail P184
A boat build is nothing but a complicated series of details, and I get right into the Nitty Gritty of Catamaran Building Detail in this weeks episode. The multitude of projects within this project mount as I drill holes in a perfectly good Catamaran Hull. ...
Dual Yanmar 4Jh57 Catamaran Engine Install Ep183
Life On The Hulls
Dual Yanmar 4Jh57 Catamaran Engine Install Ep183
Two years after purchase , these brand new Dual Yanmar Engine Units are being installed. 2 x Yanmar 4jh57 Shaft Drive systems will give us the extra propulsion and reliability that sail drives simply cant beat. Shaft drives, reduce maintenance, provide a s...
Ep182  The Hardwork Starts NOW!
Life On The Hulls
Ep182 The Hardwork Starts NOW!
Outlining a plan to demould the Catamaran Deck Part is all in this week's video. Revisiting some elements that had long been forgotten and I have come to the conclusion that "The Hard Work Starts Now" Cheers - Ross Patreon Membership Thank you for support...
Ep181 Grinding the Excess Laminate – Catamaran Deck Build
Life On The Hulls
Ep181 Grinding the Excess Laminate – Catamaran Deck Build
Getting the Catamaran Deck Flange back to the mould edge to determine the separating line is critical before demoulding. This week I grind the excess laminate and start to think about demoulding mounts to lift the deck out of the mould. Patreon Membersh...
Ep180 – Working for Mates Rates – Finishing the Catamaran Deck Build
Life On The Hulls
Ep180 – Working for Mates Rates – Finishing the Catamaran Deck Build
Sharing the fun with someone else is always better than slaving away on your own, and this week my great buddy Jeff finally makes an appearance and gets down and sticky on the cockpit roof and Foredeck hatches. Offering not one , but 2 days of work to help...
Ep179  The Saloon Roof Challenge
Life On The Hulls
Ep179 The Saloon Roof Challenge
Possibly one of the hardest parts of this Catamaran Build has been the Saloon Roof Challenge .Pull out the stops and get er done, I say. Patreon Membership Thank you for supporting my production - https://www.patreon.com/lifeonthehulls If you would like...
Ep178 Sailing Holiday Plans Scrapped- Boat Work is now in Top Gear.
Life On The Hulls
Ep178 Sailing Holiday Plans Scrapped- Boat Work is now in Top Gear.
A blow to our family holiday plans leaves me with the chance to get a whole lot more boat work done and this week is no exception. Hoards of laminating sees the cockpit mouldings stiff and relatively thin due to the use of Soric Core Mat. Our Sailing Holid...